Expected User Acceptance: 26 March 2013

User Acceptance Test Plan

Resources

Testing will be done at the end of every iterations with the use of test cases. If there is any bugs found during the testing, it will be logged in the Bug Log.

Iteration 4


Iteration 5

  • Coming Soon!


Iteration 6

  • Coming Soon!


Iteration 7


Iteration 8


Pre User Testing 1 Integration Testing (Iteration 9)


Iteration 9


Pre-Heuristics Evaluation Testing (Iteration 10)

  • Coming Soon!


Bug Log

We will be inviting our SIS experts to help us critique the usability issues in our Web application!


Heuristic evaluations will follow the How to Conduct a Heuristic Evaluation and Ten Usability Heuristics readings by Jakob Nielsen.

Using Nielsen's ten heuristics, evaluators will list as many usability issues as possible. It is less important that the evaluators worry about exactly which heuristic the usability issues occur in.

The heuristics are there to help evaluators find a variety of different types of usability issues. For each usability issue found, the evaluator should capture a description of the issue written as concisely and as specifically as possible.


We are also using Nielsen' Severity Ratings for Usability Problems in our Heuristic Evaluation.


Heuristics Severity Ratings

1. Visibility of system status

2. Match between system and the real world

3. User control and freedom

4. Consistency and standards

5. Error prevention

6. Recognition rather than recall

7. Flexibility and efficiency of use

8. Aesthetic and minimalist design

9. Help users recognize, diagnose, and recover from errors

10. Help and documentation

Not related to any heuristic

0 = I don't agree that this is a usability problem

1 = Cosmetic problem only

2 = Minor usability problem

3 = Major usability problem

4 = Usability catastrophe


Heuristic Evaluation 1

Date: 15 February 2013

Location: Singapore Management University , SIS


Documentation Results Followup Actions


  • To solve Heuristic problems after mid terms!

We conduct user testing to see how do our stakeholders respond to the application that we have built.

User Test 2

Date: 26 February 2013

Location: The Hub


Documentation for User Test 2

For User Test 2, we made use of templates taken from Usability.gov.

The web provides us with good information regarding user testing!

Documentation Results Followup Actions
  • None


  • None

User Test 1

Date: 16 Jan 2013 Time: 1200hrs - 2030hrs
Location: The Hub


Documentation for User Test 1

Documentation Results Followup Actions


Photos of the User Test 1 at The Hub

User Test 1