Bug
Bug Metric
*Bug Points = No. of Bugs X Bug Level
Bug Graph
Bug Points Graph
*Bug Points = No. of Bugs X Bug Level
Testing
Unit testing
- Done in every sprint
- Every functionality that is developed during the sprint is tested
- Emphasis is on quality of functionality developed
Integration Testing
- Done in each sprint after different functionalities are integrated
- Emphasis is on identifying issues which surface during integration
Regression Testing
- Testing everything completed in earlier sprints to ensure quality of the application developed
Usability Testing
- Emphasis is on finding User Interface e.g. navigation, error messages issues
- We attempt to measure ourselves against the 10 heuristic standards
User Acceptance Test
- Emphasis is on testing whether the final product is ready to be shipped