To see if our system is performing well, we have been conducting internal integration tests. The master results can be seen from the link below: | To see if our system is performing well, we have been conducting internal integration tests. The master results can be seen from the link below: | ||
*[https://wiki.smu.edu.sg/is480/Image:Internal_Integration_Test.xlsx Integration Tests Master Results - Phoenix] | *[https://wiki.smu.edu.sg/is480/Image:Internal_Integration_Test.xlsx Integration Tests Master Results - Phoenix] |
Revision as of 13:00, 24 April 2013
HOME | PROJECT OVERVIEW | PROJECT MANAGEMENT | DOCUMENTATION |
Contents
Internal Integration Testings
To see if our system is performing well, we have been conducting internal integration tests. The master results can be seen from the link below:
User Test 2 (12 April 2013)
The second User Test was conducted among 10 different students who had a vast experience in CCA life in SMU. The link below contain our raw testing result data.
User Test 1 (19 Feburary 2013)
We have conducted our very first User Acceptance Test where eight students from different faculty participated for the test on 19 February 2013. The purpose of our UATs is to test major functionalities that have been done and also to find if the users are able to find new bugs and/or issues. More information about the test cases can be found over the hyperlinks below:
Usability Test 1 (15 February 2013)
Our very first Usability Testing was conducted on 5 February 2013. The purpose of our UTs is to ask feedbacks about User Interface (Usability) of our product among the users. More info about testing procedure can be found over hyperlink below: