Difference between revisions of "IS480 Team wiki: 2012T2 Team Phoenix Metrics"
Jump to navigation
Jump to search
Line 68: | Line 68: | ||
<b>Actions Taken</b><br> | <b>Actions Taken</b><br> | ||
[[Image:Phoenix Bug Metric Mitigation Strategy.png|750px]]<br><br> | [[Image:Phoenix Bug Metric Mitigation Strategy.png|750px]]<br><br> | ||
+ | |||
+ | <b>Currently Identified Bug</b><br> | ||
+ | *Xcode Certificate (Inability to deploy to iPhone device (Found 29/10, Solved 02/11) | ||
+ | *Login UI is not connected to Main Menu (Found 02/11, Solved 04/11) |
Revision as of 21:43, 6 November 2012
HOME | PROJECT OVERVIEW | PROJECT MANAGEMENT | DOCUMENTATION |
Schedule Metrics
The objective of Team Phoenix's Schedule Metric is to track overall progress of Team Phoenix and discuss appropriate action(s) when necessary.
Points Calculation:
[Actual Number of Days] / [Planned Number of Days] to get a percentage point. Point that was calculated will determine the actions based on the mitigation strategy below.
Iteration 0 Schedule Metric - Updated per 4 November 2012
Iteration 1 Schedule Metric - Updated per 6 November 2012
Bug Metrics
Currently Identified Bug
- Xcode Certificate (Inability to deploy to iPhone device (Found 29/10, Solved 02/11)
- Login UI is not connected to Main Menu (Found 02/11, Solved 04/11)