Difference between revisions of "IS480 Team wiki: 2012T2 Team Phoenix Metrics"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 50: | Line 50: | ||
The objective of Team Phoenix's Schedule Metric is to track overall progress of Team Phoenix and discuss appropriate action(s) when necessary.<br><br> | The objective of Team Phoenix's Schedule Metric is to track overall progress of Team Phoenix and discuss appropriate action(s) when necessary.<br><br> | ||
− | [[Image:PHOENIX SCHEDULE MET | + | [[Image:PHOENIX SCHEDULE MET.png|750px]]<br> |
<b>Points Calculation:</b><br> | <b>Points Calculation:</b><br> | ||
Line 61: | Line 61: | ||
===Bug Metrics=== | ===Bug Metrics=== | ||
+ | <b>Final Bug Metric</b><br> | ||
+ | [[Image:Bug Phoenix.png|750px]] | ||
+ | |||
<b>Bug Identification</b><br> | <b>Bug Identification</b><br> | ||
[[Image:Phoenix Bug Metrics.jpg|750px]]<br><br> | [[Image:Phoenix Bug Metrics.jpg|750px]]<br><br> |
Latest revision as of 17:39, 23 April 2013
HOME | PROJECT OVERVIEW | PROJECT MANAGEMENT | DOCUMENTATION |
Schedule Metrics
The objective of Team Phoenix's Schedule Metric is to track overall progress of Team Phoenix and discuss appropriate action(s) when necessary.
Points Calculation:
[Actual Number of Days] / [Planned Number of Days] to get a percentage point. Point that was calculated will determine the actions based on the mitigation strategy below.
Current Project Schedule Tracking Metric: Phoenix Schedule Tracking
Bug Metrics
Bug Metric Tracker:
Phoenix Bug Tracker