Team Logo

Project Stakeholders

Phoenix Team Members & Responsibilities

No MEMBER ROLE RESPONSIBILIIES
1 Kristopher Haryadi [1] Project Manager / Wiki Master
  • Responsible for overall project planning & execution
2 Dionysius Yan Wei Quan [2] Quality Assurance / Lead Tester
  • Prepare test plans as related to User Acceptance Test and Usability Test
3 Jean Choy Joo Min [3] Business Analyst / System Analyst
  • Provide necessary information to Lead Developer of the team
4 Saraswathy Aruna Annamalai [4] Lead Developer
  • Leading the team in the development of both Web App & iPhone App
5 Chew Kee Min [5] Software Engineer
  • Work closely with Lead Developer for the development of Web App & iPhone App

Project Supervisor: Professor Kyong Jin Shim [6]

Project Sponsor: SMU Macness CCA [7]

  • Derek Lee - Developer Director, SMU Macness [8]
  • Hu Jiaming - President, SMU Macness [9]

Project Overview

Project Description

Team Phoenix is building a CCA portal (smyou.com) for SMU students to revolutionize the way students share their student life activities. This portal is dedicated for them to find out more about CCAs in SMU, starting from their background information into future events and other announcements, which are updated by committee of the CCA. In addition, students will be able to rate their own CCAs accordingly. Furthermore, this application enables students to share their opinion among their peers by creating Testimonials. Finally, the team will create an iPhone application, with the same functionality which enables student to check the latest update of student life activities from their own iPhone. Ultimately, Team Phoenix builds this portal

Team Motivation

  • To revolutionize the way SMU Students share their social activity life

Deliverables

Outcomes: A web application (smyou.com) and a native iPhone App that enables students to check core functionalities from their iPhone. Value Statement:

  • Convenient Way to browse available CCA and student activities in SMU
  • Ability to embrace unity and diversity to share valuable student activities among students in SMU
  • Acts as robust platform to promote vibrant student life in SMU to both internal and external stakeholders

X Factor

Project Scope

  • Authentication
    • Login & logout
    • Facebook Connect
    • Backend authentication via Wordpress for exco members
  • CCA Management
    • Update CCA content profile
      • Description
      • Logo
      • Founded Year
      • Achievements
      • List of members
    • Update events/announcements
      • Poster (Images)
      • Event description
      • Registration Button
  • Confirm membership
    • Public, SMU Student, and CCA Members Access
    • View Student Profile
    • View ‘Who Viewed Me’
    • View ‘Mr & Ms Popular’
    • Search CCA
    • View CCA Contents
    • Rate own CCA
    • Update events/announcements – only committee
    • Update Relationship status
    • Update ‘About Me’
    • Post testimonial to other students
    • Delete testimonial
  • iPhone Application
    • View CCA Profile
    • Search CCA
    • Rate CCA
    • View Student Profile
    • View “Mr & Ms Popular”
    • Create student testimonial

System Overview

Technology and Tools Used

Function Tools
Development Environment Xcode (Integrated Development Environment) - IDE
Application Framework Cocoa Framework
Host Server MAMP
Database IOS 5SQLite Database Application
Graphic Design Interface builder application that lets build interfaces visually

Use Case Diagram

Facility Booking System.jpg
CCA Portal System.jpg

Resources & References

  • Developing Environment
    • iOS SDK Programming (iOS 4.2 and Xcode 4), James Brannan and Blake Ward, 2011.
    • iOS Programming Guide, Apple Developer, 2012
    • Beginning iPhone 4 Development, Dave Mark, 2011

Project Schedule & Milestones

Phoenix Schedule1 Draft1.jpg

Schedule2 Draft1.jpg

Risk & Mitigation Plan

Description Impact on Project Probability Severity Risk Reduction/Mitigation Strategy
Significant changes in user requirements Time and Quality Low Low Ensure that user requirements are fully investigated and agreed before specification. Should there is an ad-hoc change in the requirement, team to discuss the impact of change on project design and schedules.
Loss of power or internet/server connections during project acceptance demo Reviewers will not take the project seriously if it cannot be demonstrated to work Medium High System will be deployed in more than 1 machine. When doing demos, have screen shots available locally in case of loss of connections
Lack of support from IITS Delay on facility/room booking functionality Medium High SMU Macness is currently liaising with SMUSA and IITS to gain support for our project. If team does not get concrete reply by week 9, team to simulate backend process of facility booking system
Lack of knowledge in iOS development and Objective C Programming language Time and Quality High Medium Allocate time for learning and approach friends/instructors with relevant experience for guidance

Learning Outcomes

  • Integration of Business & Technology in a sector context
    • Business IT Value Linkage
      • Understanding & creating the linkages between business strategy and business value creation (end-user engagement)

  • IT Architecture, Design & Development Skills
    • System Requirements Specification Skills
      • Learn to elicit functional and non-functional requirements from clients, formalize them, and then develop a solution
    • Implementation Skills
      • Increase Competency in JQuery and Android OS Developing Language

  • Communication Skills
    • Presentation Skills
      • More experience in terms of project presentation to real client from real industry
    • Writing Skills
      • Produce constant update to business client and supervisors