Difference between revisions of "IS480 Team wiki: 2012T2 Team Phoenix"
Line 67: | Line 67: | ||
<b>Notification</b> <br> | <b>Notification</b> <br> | ||
As per our discussion with supervisor and clients, Team Phoenix has decided to use CodeIgniter to build our own Website and Titanium SDK for our development tools. As a result, we have dropped Wordpress Content Management System technology for our project development. <br> | As per our discussion with supervisor and clients, Team Phoenix has decided to use CodeIgniter to build our own Website and Titanium SDK for our development tools. As a result, we have dropped Wordpress Content Management System technology for our project development. <br> | ||
− | <u> | + | <u>28 January 2013</u><br> |
We have deployed our first prototype of the website. Please check http://smyou.dyndns.org/proto.<br> | We have deployed our first prototype of the website. Please check http://smyou.dyndns.org/proto.<br> | ||
− | <u> | + | <u>21 February 2013</u><br> |
Our beta system for Mid Term Evaluation has been uploaded. Kindly check http://smyou.dyndns.org/uat<br><br> | Our beta system for Mid Term Evaluation has been uploaded. Kindly check http://smyou.dyndns.org/uat<br><br> | ||
Revision as of 16:05, 21 February 2013
HOME | PROJECT OVERVIEW | PROJECT MANAGEMENT | DOCUMENTATION |
Contents
About Us
Hi there, and welcome to Team Phoenix Wiki Page!
We are a group of students from SIS currently in the learning journey of IS480 (IS Application Project). Our goal is to learn ultimate Project Management before going into corporate industry. Rain or shine, we believe that this will be one of the most meaningful experience in our life as students in SMU.
Currently, we are collaborating together with SMU Macintosh Society (Macness) [1] to build a website and an iPhone App to allow SMU Students to access latest information from Student Community and CCA in SMU. This project serves as a Proof-of-Concept. In addition, we are also simulating this iPhone App to access Facility Booking System which is equipped with mapping functionality to help students find their way to GSRs, SRs, or CRs across campus.
Want to know more about us? Find out more information from the tabs above! (:
Updates
Last Team & Supervisor Meeting
Supervisor Minutes 02 18-01-2013
Next Team Meeting
25 January 2013 (Supervisor Meeting with Professor Kyong)
Notification
As per our discussion with supervisor and clients, Team Phoenix has decided to use CodeIgniter to build our own Website and Titanium SDK for our development tools. As a result, we have dropped Wordpress Content Management System technology for our project development.
28 January 2013
We have deployed our first prototype of the website. Please check http://smyou.dyndns.org/proto.
21 February 2013
Our beta system for Mid Term Evaluation has been uploaded. Kindly check http://smyou.dyndns.org/uat
Major Milestones
Midterm Presentation Slides (22 February 2013 - 1530 hrs)
[To Be Uploaded Here]
User Acceptance Test - UAT #1
We have conducted our very first User Acceptance Test where eight students from different faculty participated for the test on 19 February 2013. The purpose of our UATs is to test major functionalities that have been done and also to find if the users are able to find new bugs and/or issues. More information about the test cases can be found over the hyperlinks below:
Usability Testing - UT #1
Our very first Usability Testing was conducted on 5 February 2013. The purpose of our UTs is to ask feedbacks about User Interface (Usability) of our product among the users. More info about testing procedure can be found over hyperlink below:
- UT1 Instruction Document (05-02-2013)
- UT1 Survey Questions (05-02-2013)
- UT1 Detailed Test Cases (05-02-2013)
Acceptance Presentation Slides (November 2012)
Acceptance Presentation Slides
Progress (Iterations)
Iteration 3
Milestone | Goals to Complete | Status |
---|---|---|
#3 UAT1 18 FEB 2013 |
1. Proposal
|
Not Completed |
Iteration 2
Milestone | Goals to Complete | Status |
---|---|---|
#2 UT1 26 OCT 2012 |
1. Proposal
|
Completed |
Iteration 1
Milestone | Goals to Complete | Status |
---|---|---|
N/A | 1. Proposal
|
Completed |
Iteration 0
Milestone | Goals to Complete | Status |
---|---|---|
#1 Proposal 26 OCT 2012 |
1. Proposal
|
Completed |