Difference between revisions of "IS480 Team wiki: 2012T2 Team Chm MidTerm Wiki"
(20 intermediate revisions by 2 users not shown) | |||
Line 5: | Line 5: | ||
|} | |} | ||
− | <big><p style="text-align: left; font-size: 150%;">[[IS480_Team_wiki:_2012T2_Team_Chm| <font color=#000000" | + | <big><p style="text-align: left; font-size: 150%;"><center> |
+ | [[IS480_Team_wiki:_2012T2_Team_Chm|<font color="#000000" face=""><ins>''' MAIN WIKI'''</ins></font>]] | ||
+ | | ||
+ | [[IS480_Team_wiki:_2012T2_Team_Chm_Final_Wiki|<font color="#000000" face=""><ins>''' FINAL WIKI'''</ins></font>]] | ||
+ | </center></p></big><br> | ||
[[Image:CHM1.png|580px|right]] | [[Image:CHM1.png|580px|right]] | ||
== Project Progress Summary == | == Project Progress Summary == | ||
− | Presentation Slides | + | '''[https://www.dropbox.com/s/3oo5fypw91m5b6l/TeamChmMidtermPresentation.pdf Presentation Slides]'''<br> |
+ | '''[http://mobisupermarket.com/bonx Mobisupermarket Frontend Deployment Environment]''' | ||
=== Overview === | === Overview === | ||
{| cellpadding="9" style="border: 1px solid darkgray; text-align: center; height:50px" | {| cellpadding="9" style="border: 1px solid darkgray; text-align: center; height:50px" | ||
Line 51: | Line 56: | ||
|style="text-align: left;"| | |style="text-align: left;"| | ||
'''No realistic data in our project'''<br /><br /> | '''No realistic data in our project'''<br /><br /> | ||
− | As the project progressed, the team was advised by our supervisor to try to make the spending behaviour slightly more genuine by means of incorporating real products that existed into the platform's catalog of products, which would in turn be more realistic during our User Tests. This rang true amongst the team because the products in the default catalog provided by Magento was either outdated or fictitious. Thus, both the sponsor and the team has been on the search for the products and their products' description to be input into our catalog | + | As the project progressed, the team was advised by our supervisor to try to make the spending behaviour slightly more genuine by means of incorporating real products that existed into the platform's catalog of products, which would in turn be more realistic during our User Tests. This rang true amongst the team because the products in the default catalog provided by Magento was either outdated or fictitious. Thus, both the sponsor and the team has been on the search for the products and their products' description to be input into our catalog. The team found the [http://helloyellowmushmellow.tumblr.com Yellow Mushmellow] online blogshop, and the owner was willing to allow her products to be input into our catalog. |
|} | |} | ||
Line 181: | Line 186: | ||
{| | {| | ||
− | |[[Image: | + | |[[Image:Planned2.png|500px]] |
− | |[[Image: | + | |[[Image:Actual1.png|560px]] |
|} | |} | ||
Line 194: | Line 199: | ||
=== Project Metrics === | === Project Metrics === | ||
− | + | ||
==== Schedule Metric ==== | ==== Schedule Metric ==== | ||
{| cellpadding="9" style="border: 1px solid darkgray; text-align: center; height:50px" | {| cellpadding="9" style="border: 1px solid darkgray; text-align: center; height:50px" | ||
Line 215: | Line 220: | ||
<br> | <br> | ||
+ | <big><big>'''Release Burn-down Chart'''</big></big><br><br> | ||
+ | [[Image:ReleaseBurndown.png|525px]]<br /><br /> | ||
<big><big>'''Burn-down Charts'''</big></big><br><br> | <big><big>'''Burn-down Charts'''</big></big><br><br> | ||
[[Image:Burndownchart1.png|525px]] | [[Image:Burndownchart1.png|525px]] | ||
Line 316: | Line 323: | ||
|style="text-align: center;"|Use Case | |style="text-align: center;"|Use Case | ||
|style="text-align: left;"| | |style="text-align: left;"| | ||
− | *[https:// | + | *[https://wiki.smu.edu.sg/w/is480/images/8/8f/Consumer_Use_Case.PNG Consumer Use Case] |
+ | *[https://wiki.smu.edu.sg/w/is480/images/3/34/Marketing_Professional_Use_Case_2.png Marketing Professional Use Case] | ||
|- | |- | ||
Line 340: | Line 348: | ||
*'''Web Links''': | *'''Web Links''': | ||
− | :#'''[http://mobisupermarket/ | + | :#'''[http://mobisupermarket.com/bonx Mobisupermarket Frontend Deployment Environment]''' |
− | :#'''[http://mobisupermarket/ | + | :#'''[http://mobisupermarket.com/magento Mobisupermarket Frontend Staging Environment]''' |
:#'''[https://wiki.smu.edu.sg/is480/2012T2_Team_Chm:_Project_Design#Server_Architecture_.26_Resources Server Architecture & Resources]''' | :#'''[https://wiki.smu.edu.sg/is480/2012T2_Team_Chm:_Project_Design#Server_Architecture_.26_Resources Server Architecture & Resources]''' | ||
Line 416: | Line 424: | ||
====Conducted Session ==== | ====Conducted Session ==== | ||
− | + | User Testing 1 consisted of 2 sessions was successfully conducted on <b>23 & 24 Jan 2013, 1 – 3pm at the School of Economics SR 5.1 & SR 2.3 respectively.</b><br> | |
A total of <b>30 students</b> from the various schools in SMU assumed the role of a online shopper participated.<br><br> | A total of <b>30 students</b> from the various schools in SMU assumed the role of a online shopper participated.<br><br> | ||
Line 436: | Line 444: | ||
<br> | <br> | ||
− | === User Testing 2 | + | === User Testing 2 === |
{| cellpadding="9" style="border: 1px solid darkgray; text-align: center; height:50px" | {| cellpadding="9" style="border: 1px solid darkgray; text-align: center; height:50px" | ||
|scope="row" width="1200" style="text-align: left; background: #F5F5F5"| | |scope="row" width="1200" style="text-align: left; background: #F5F5F5"| | ||
Line 609: | Line 617: | ||
|style="text-align: left;"| | |style="text-align: left;"| | ||
'''Rachel'''<br> | '''Rachel'''<br> | ||
− | * | + | *Huge amount of efforts are needed to make an application user friendly |
+ | |||
|- | |- | ||
Latest revision as of 17:55, 16 April 2013
MID-TERM WIKI |
Project Progress Summary
Presentation Slides
Mobisupermarket Frontend Deployment Environment
Overview
Team Chm is in the midst of Sprint 10 at the moment.
|
Project Highlights
EVENT | HIGHLIGHT / ISSUE |
---|---|
Sprint 2 20 Nov 2012 - 04 Dec 2012 |
Incorrect commits to the repository altered files that were meant to be machine-specific Due to the integration with Magento and its database, the team had some problems committing and updating the project repository. Hence, the project wasn't able to continue and development had to be put on hold so as to address the project repository issue. The issue was then solved, and only certain major files were committed. The new risk and the risk mitigation plan was then recorded so as to prevent such problems from happening again. |
Sprint 5 |
No transactional data for Insights |
Sprint 7 |
No realistic data in our project |
Technical Complexity
The technical complexities of our tools employed are in the following descending order:
COMPLEXITY | DESCRIPTION |
---|---|
Magento Community Edition |
|
D3.js Data Manipulation Framework |
|
jQuery UI Framework |
|
Foundation Framework by ZURB |
|
Project Management
Project Status
Chapters | Status | Confidence Level (0-1) | Member In-Charge |
---|---|---|---|
Authentication | 100% developed and deployed | 1 | Joseph |
Manage Campaign | 100% developed and deployed | 1 | Leonard |
Manage Hooks - Coupons | 100% developed and deployed | 1 | Rachel |
Manage Hooks - Social Messages | 0% developed | 0.9 | Max |
Manage Purchases | 100% developed and deployed | 1 | Leonard & Rachel |
Manage Insights | 20% developed | 0.9 | Max |
Project Scope
Project scope has not changed since inception
|
---|
Schedule (Planned vs Actual)
No changes to proposal and acceptance milestones; and only milestones after them have significant changes to the schedule.
Refer to the current timeline for more information.
Change #1: An additional User Testing, for data gathering needed for our BI tool has been added
Change #2: Part of the Manage Hook function has been shifted over to past mid terms
Change #3: Part of the Manage Insights has been shifted to before mid terms
Project Metrics
Schedule Metric
The diagram below shows the burn-down charts of the 9 sprints we have completed thus far: Links |
Bug Metric
Number of Bugs Found There was a spike in the number of bugs found in Sprint 9. This is due to the more rigorous testing conducted on our application during User Testing 2. |
---|
Links |
---|
Risk Management
Added new Risks as at mid-term. Full entries are shown under the Project Management in the Risk Management Table.
Technical | ||||
---|---|---|---|---|
5. | Getting meaningful and realistic testers | In order for the project to realize its full potential, there is a need for professional feedback | Project Manager in talks with sponsor to organise a UAT session with MITB students. | |
6. | Rate of development is decreasing | Project would take a longer time to complete | Project Manager to plan and pre-empt the team of the tasks coming up in the following sprint and to encourage team mates to start studying earlier.
|
Product Quality
Intermediate Deliverables
Stage | Specification | Modules |
---|---|---|
Project Management | Minutes | |
Metrics | ||
Requirements | Product Backlog | |
Analysis | Use Case | |
Design | ER Diagram | |
Testing | User Testing 2 Plan |
Deployment
- Staging & Development Environment: deployed on GoDaddy server
- Database: Magento EAV database structure
- Web Links:
User Testing 1 (Data Gathering)
Objectives
Scope of Test
Conducted SessionUser Testing 1 consisted of 2 sessions was successfully conducted on 23 & 24 Jan 2013, 1 – 3pm at the School of Economics SR 5.1 & SR 2.3 respectively. User Feedback
|
User Testing 2
Objectives
Scope of Test
Conducted SessionThe User Testing 2 session was successfully conducted on 15 Feb 2013, 1 – 4pm at the School of Economics SR 2.5.
Most Common Feedback & Rectification
|