HeaderSIS.jpg

Difference between revisions of "IS480 Team wiki: 2012T2 Team Chm Final Wiki"

From IS480
Jump to navigation Jump to search
Line 57: Line 57:
 
! scope="row" style="background: #C0C0C0"| '''Developing the Social Influence Algorithm'''
 
! scope="row" style="background: #C0C0C0"| '''Developing the Social Influence Algorithm'''
 
|style="text-align: left;"|  
 
|style="text-align: left;"|  
'''Incorrect commits to the repository altered files that were meant to be machine-specific ''' <br /><br />
+
*Developing the Social Influence Algorithm required research and constant communication with our sponsor for details
It was not only impractical to commit the entire working folder to our repository because it amounted to 109 megabytes, but also because certain files that resided in the working folder were machine-specific. Minimal documentation by Magento exacerbated the problem and hence the eventual solution only came about with advice from various tech sites (stackoverflow, roseindia, tech blogs) after 2 weeks of trial and error.
+
*Considered as a technical complexity
 
 
Due to the integration with Magento and its database, the team had some problems committing and updating the project repository. Hence, the project wasn't able to continue and development had to be put on hold so as to address the project repository issue. The issue was then solved, and only certain major files were committed. The new risk and the risk mitigation plan was then recorded so as to prevent such problems from happening again.<br />
 
 
|-
 
|-
  
 
! scope="row" style="background: #C0C0C0"| '''User Acceptance Testing'''
 
! scope="row" style="background: #C0C0C0"| '''User Acceptance Testing'''
 
|style="text-align: left;"|  
 
|style="text-align: left;"|  
''' No transactional data for Insights ''' <br /><br />
+
*Faced difficulties in securing testers (B6 students) due to the unavailability of our sponsor
In the course of developing our BI tool during Sprint 5, the team was advised by our supervisor that we do not have any meaningful transactional data in our project. Hence, upon discussion with our sponsor, the team and the sponsor decided to to have a data gathering cum user testing session. Over 30 friends were invited so shop online using Magento E-commerce website, and they were each given $1000 virtual money to spend.
+
*Still managed to conduct a UAT on 5 Apr but to a smaller pool of testers
 
|-
 
|-
  

Revision as of 17:18, 16 April 2013

FINAL WIKI

MAIN WIKI            MID-TERM WIKI


Team Chm1.jpg

Project Progress Summary

View our one minute pitch HERE

   Final Presentation Slides

   Team Chm Deployed Site Link



  • Team Chm has completed 13 sprints in total and is now finishing its final milestone.
  • This is where we are on the timeline:
FinalSchedule.png

Project Highlights

EVENT HIGHLIGHT / ISSUE
Sprint 11

Social Influence Quantification - Algorithm to quantify the effect of Social Messages

Sprint 12

Sponsor unavailability

Project Challenges

EVENT HIGHLIGHT / ISSUE
Developing the Social Influence Algorithm
  • Developing the Social Influence Algorithm required research and constant communication with our sponsor for details
  • Considered as a technical complexity
User Acceptance Testing
  • Faced difficulties in securing testers (B6 students) due to the unavailability of our sponsor
  • Still managed to conduct a UAT on 5 Apr but to a smaller pool of testers

Project Achievements

Project Management

Project Schedule (Planned VS Actual)

Metrics

Schedule Metrics

Bug Metrics

Technical Complexity

Quality of Product

Project Deliverables

Quality

Deployment

User Acceptance Test (UAT)

Objectives

Test Details & Outcome

Reflections

Team Reflection

Individual Reflections