Schedule Metrics
- Aim: To track the progress of development for each iteration.
- Formula: Schedule Metric = Estimated Duration / Actual Duration
Our current schedule metric
Bug Metrics
- Aim: To identify the number of bugs in each iteration and take respective plans for quality assurance.
- Formula: Identifying the severity level of the bug
To view our bug metric :