OVERVIEW:

Tweetadoo is currently in our 6th iteration.

Listed are some of the the key accomplishment that we have achieved due 1 October 2012:

• We managed to develop an Ipad application which is based on Objective C - a language we were not taught before

• We have gathered favourable and userful results from our user testing which comprises of 40 testers conducted on 24, 26 September 2012.

• We were on schedule despite having faced with some difficulties while coding the webservice and integrating the backend to the frontend Ipad application.

We are confident of completing the project to upload the Ipad to the App Store successfully.

 

1 PROJECT HIGHLIGHTS:

What unexpected Things happen?

Scope Changes:

Added - Webservice (coding ourselves), Retweet/ Mention/ Follow, Database functionality.

Remove - Badges Award System, Trending Topics, Settings Page functionality

Time Constraint:

Learning of objective C language took longer than the designated 3 months

• More time is placed in the development of the webservices and the understanding of backend data, thus we have to shift our focus from the front-end to the back-end too.

Technical Difficulties:

Data scrapping to extract and display images, and titles on the newsfeed

 

2 PROJECT MANAGEMENT:

 

2.1 Project Status:

Overall Completion Status: 70%

Overall Confidence Level of app deploying to App Store: 100%

 

Task/ Function/ Features, etc Status Confident Level (0-1) Comments

Twitter Single Sign on

Fully deployed and tested 100% Function Completed

1

Completed before acceptance

Twitter Single Sign on

Fully deployed and tested 100% Function Completed

1

Completed before acceptance

Registration

Fully deployed and tested 100% Function Completed

1

Completed before acceptance

Display of Friend List

Fully deployed and tested 100% Function Completed

1

Completed before acceptance

Terms and Conditions

Fully deployed and tested 90% Function Completed

1

Awaiting LARC to input the legalized terms and condition

View Profile page

Fully deployed and tested 90% Function Completed

1

In the midst of discussion whether to remove badges function or not

Favourite/ Unfavourite Artiste

Did Internal testing bit have not been deployed 90%

Awaiting deployment and approval from client

1

Need to deploy and do user testing (thomas)

Manage Newsfeed

Deployed and tested first version UI 50%

Web service 50%

0.9

"Tweaking the application to accommodate changes from UT and client

1. Handle slow loading (memory allocation for iPad)

2. Content to display not only words but pictures and site headers related to the content (requires data extraction)

3. Push 2. to display on iPad

4. Implement Youtube extracted video thumbnail on iPad (backend extraction has been completed for Youtube)

5. Implement personalized tweets based on thumbs up and favourited artistes. (Displaying of Fav. Artistes feeds has been completed

6. Need to implement algorithm to include even more personalization (4 functions -> thumbs up, view detailed view, mention and retweet"

Thumbs Up

Completed internal testings but have not been deployed

Web Service 90% completed

1

Needs to be implemented on the iPad

We have completed backend implementation and have done internal testing

Need to discuss with LARC to include the additional tables we have created for LARC

Need to integrate both front and back end

Manage Group

Not deployed and not tested

Web Service 0% completed

0.8

Only the UI part has been partially completed.

View (100%)

Create (100%)

Delete (0%)

Edit (0%)

Web service has not been implemented

Badges Award System

Not deployed and not tested 0%

Web Service 0% completed

0.5

In the midst of discussion whether to remove badges function or not

App Design

100%

1

Keeping the current UI based on positive user feedbacks

Working on the user testing feedback

50%

0.8

We are consolidating the user feedbacks and resolving the critical issues on hand

 

2.2 Project Schedule (Planned Vs Actual):

Updates since Acceptance:

Significant changes to scope:

• Change 1 : Added Webservice (coding ourselves) - Initial LARC was helping us with the coding webservice, however, we decided to code ourselves as we needed the webservices quickly so as to carry on with the development of our application.

• Change 2 : Added Retweet/ Mention/ Follow Functionalities - As our application was closely linked with Twitter, our client suggested that he would like the users to be able to do some twitter functions on our app

• Change 3 : Added database - We needed to implement a database to save data from LARC's server

• Change 4 : Removed Badges Award System - Our client wanted us to focus on the app's newsfeed functions and he felt that the badges functions would not be necessary and would consume some time implementing it

• Change 5 : Removed Trending Topics - We removed it as the application crawls only twitter and youtube feeds

• Change 6 : Removed Settings - We removed it as the the application would be relying on the user's app interaction to display the relevant tweets

Refer to : Schedule Actual Vs Planned

Tweetadoo Scope Acceptance.jpg
Tweetadoo Scope Midterm.JPG

 

2.3 Project Metric:

Schedule Metric:

Please refer to: Project Metrics for the project metrics

 

Bug Metric:

Tweetadoo Bug Diagram.png

 

2.4 Project Risks:

Risk Probability Impact Mitigation

LARC server down

Low

High

Setting up of alternate server with a set up similar to that of LARC's server which includes a snapshot of their database

Application not accepted by app store in time for final presentation

High

High

Deploy a working but incomplete application early for review by App Store and continue development of the final application with inputs return from App Store

Increase of scope due to unforeseen technical difficulties

Medium

Medium

Evaluation of current functionalities and schedules to see if the additional scope is workable with the current functionalities and thus, evaluate if we need to drop a function or 2.

Random crashes of ipad due to inefficient handling of memory

High

High

Release the memory as soon as the function is closed (km)


 

2.5 Technical Complexities:

Technical Complexities Description

Deploying app to ipad using objective C)

Deploying app to ipad using objective C)

Creating of webservices

Using memcatche as a workaround to slow connection for mysql server

Content scrapping

Scrapping has to be tune to individual websites

Adapting our current system (webservice and IOS application) to fit the client's system (database and memcatche)

We have to understand how to store the data in our mysql and to adapt our webservices to compliment our webservices with the client's database. Client's database is not in 3rd normal form that we learnt in our dm module, hence we need to explore how the data is being stored.

Heavy use of MVC model to push specific views for display to the ipad

NIL

 

3 QUALITY OF PRODUCT

 

3.1 Immediate Deliverables

For Deliverables please refer to: Project Deliverables

 

3.2 Deployment

Klique Deployment Diagram.jpg

 

3.2 Testing

User Test Details Description

No. of user testing

40

User Testing Dates

24 - 26 Sept (10 - 6pm), each session: 20 mins

Tester Profile

Testers are belonged to 3 categories: (i) kpop lovers & own twitter account, (ii) kpop lovers who do not own a twitter account, (iii) Non-kpop lovers & own twitter account

Rationale: Guided Test - Focus more on Functionality Testing

Unguided Test - Focus more on User Interface

Survey Questions

https://docs.google.com/spreadsheet/viewform?formkey=dE1yamNaZWpKR1c0YTBLQW5KYjhibGc6MQ#gid=0

Guided Testing Document

https://docs.google.com/file/d/0Bx-a0moKfQPXLUFUaXl0Zms4VkU/edit

Survey Results

Feedback on app functionality:

• Navigation bar is too small

• too many empty spaces in newsfeed

• can't find the back button

• cannot click on the artiste picture, had to click at the areas around the picture

• The retweet, mention buttons are not prominent position

• didn't know what to do on the select favourite artiste page

• should have a select all artiste if he wants to choose all artistes

Other features that the user might want to see:

• More information about favourite kpop groups and other artistes that you haven't heard of

• Translation

• Customization of own profile background

Are you satisfied with the app?

• More information about favourite kpop groups and other artistes that you haven't heard of

•Personalised tweets

•Easy to use

•Comprehensive

•Intuitive UI

Will you introduce the app to your friends?

•find kpop artiste easily : easier to find the news

•nice design and intuitive layout that is easy to follow

•keep one updated to latest news

•useful for catching up trends

•interesting interacting with kpop fans

•makes sharing kpop stuff easier

•have not seen an app that combines with youtube

•easy access to your favourite artistes

•make life easier as kpop fans

•convenient

•frequent updates

 


4 REFLECTIONS

 

4.1 Team Reflection

• We learn how to handle scope changes by breaking it down to manageable portions

• We learnt the importance of user testing because we realised that we were carried away by our application that we cannot see what the users see.

• Team Planning and keeping one another updated is very crucial for the team's progress

• We have to strategise and ride on one another's strength to do a task efficiently

• It is important for a team member to stand up and take charge if he feels that the team's discussion is going no where or if we are progressing in the wrong direction

• It is important for the team to meet up with their client and supervisor regularly to keep them in the loop