HeaderSIS.jpg

IS480 Team wiki: 2012T1 One-hit Wonder MT Project Highlights

From IS480
Revision as of 21:20, 7 October 2012 by Kaili.tee.2009 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Undo-icon.png Main Wiki

Home white24.png Home

Calendar 2 icon&48.png Project Management

Chart line icon&24.png Project Metrics

18px‎ Technical Complexity

Users24.png Usability Studies

TeamRef.png Team Reflection


Summary Overview

Project Highlights

Project Highlights

These are some of the events highlight which takes place after Acceptance till now.

No. Area of Concern Major Event
1 Heuristic Evaluation Major changes in user interface after Heuristic Evaluation:
User interface was redesigned to standardized all buttons and layout.
2 User Testing 1 Major changes made to data validation:
Changed as many server-side validations to client-side validation.
3 Project Management Implementation of changes from User Test 1 in Iteration 5 took longer than we expected:
Due to major changes made to both the back-end and front-end codes, our team completed all amendments 4 days after the scheduled deadline.
4 Drop Functionality LinkedIn Login and data extraction was removed in Iteration 5:
Despite attempting to implement this function in both Iteration 1 and 5, due to complexity of the function, we were unable to deliver successfully, so our team negotiated with our client/supervisor and came to the conclusion to drop the function.
5 Change in Functionalities Tagging and filtering function in Iteration 5 was changed to basic ‘Search’ function which will be implemented after mid-terms:
Taking the time constraint into consideration, after the requirement gathering session with our client in Iteration 5, the change in functionality was confirmed.