Project Progress Summary
Team M.O.O.T has progressed steadily since Iteration 1 -which was kick-started post Acceptance presentation; and is currently in Iteration 4, which will last up to the end of the midterm week. We also encountered a major obstacle in coming up with an alpha version of Artificial Neural Network to determine gender in Iteration 1. There was also a change in client's requirement, contributing to the delay. Confirmation of final requirement was achieved in Iteration 2, enabling team to focus and hence team managed to catch up in Iteration 2.
By midterm, team is confident of completing 70% of AlterSense features. These features include gender recognition and basic photo taking functionalities. After midterm, team will work on implementing the narrative interaction features and refining of AlterSense in general. Team is therefore confident of delivering the complete AlterSense solution by the end of week 13.
Project Highlights
- Inclusion of machine learning
- Internal addition of stakeholders: requirement to liase with Marcom team
- Requirement changes:
- AlterSense to enable photo taking
- Gender-related content will not be limited to promotions only
- Interaction with Techy & Marlon to be replaced with photo-taking related narrative, which translates to starting over from scratch
- Analytics possibility provided by Microsoft Tag will be independently explored by CapitaMalls Asia
- Took 3 weeks to set up alpha version of Neural Network instead of only 2 weeks
- Omitted Waist-Hip-Ratio and detection of bag for gender recognition; for Kinect does not detect hip, and depth measurement to detect bag interferes with the detection of arm joint
Project Management
Project Status
S/N | Feature | Status | Confidence Level (0-1) | Comments | ||
Photo taking | ||||||
1 | Detect stationary shopper | Deployed & tested | 1 | |||
2 | Display shopper’s silhouette | Iteration 5 | 0.9 | Implemented for Acceptance version | ||
3 | Display doors with enticing scene | Iteration 5 | 0.8 | Inserted image too for Acceptance, but its activation may require more work | ||
4 | Detect shopper's gesture (reaching for a particular door) | Iteration 5 | 0.7 | |||
5 | Display change in chosen door | Iteration 5 | 0.7 | |||
6 | Display augmented reality scenery background | Deployed & tested | 1 | Refinement completed as well | ||
7 | Inserting instruction thought bubble | Deployed | 0.99 | |||
8 | Detect shopper raising right hand | Deployed | 0.99 | |||
9 | Countdown timer | Deployed & tested | 1 | |||
10 | Take a photo | Deployed & tested | 1 | |||
11 | Display photo | Deployed & tested | 1 | |||
Gender Recognition | ||||||
12 | Measure height | Deployed & tested | 1 | |||
13 | Measure shoulder & hip width | Deployed & tested | 1 | |||
14 | Detect presence of long hair | Ongoing | 0.5 | |||
15 | Detect presence of skirt | Deployed | 0.6 | |||
16 | Determine gender of shopper | Deployed & tested | 1 | |||
Promotions, Photo Gallery & Microsoft Tag | ||||||
17 | Determine type of promotions to display | Ongoing | 0.75 | |||
18 | Create tag | Deployed | 1 | |||
19 | Overlay of tag | Deployed | 0.85 | Position to be adjusted | ||
20 | Exit screen | Deployed & tested | 1 | |||
21 | Photo Gallery | Deployed | 0.9 | |||
22 | Read tag | Deployed | 0.95 | Implemented for Acceptance | ||
23 | Update tag | Iteration 6 | 0.9 | Implemented for Acceptance | ||
24 | Delete tag | Iteration 6 | 0.9 | |||
25 | Integrate tag with AlterSense | Iteration 6 | 0.9 | |||
26 | Retrieve analytics raw values from Microsoft Tag web service | Iteration 6 | 0.95 | Implemented for Acceptance | ||
27 | Parse analytics values | Iteration 6 | 0.95 | Implemented for Acceptance | ||
28 | Display parsed analytics values | Iteration 6 | 0.95 | Implemented for Acceptance |
Project Schedule
Iterations | Planned | Actual | Comments | ||
1 | Explore Classifier Algorithm | Week 1 | Week 1 | Found out about Neural Network | |
Primary research: measurement collection | 24/08/12 | 24/08/12 | 58 participants (30 males, 28 females) | ||
Analysis of measurement collection | Week 2 | Week 2 | |||
Gender differences trend establishment | Week 2 | Week 2 |
| ||
Gender recognition based on Waist-to-Hip Ratio | Week 2 | Dropped | Decided to drop Waist-to-Hip Ratio as Kinect cannot detect waist | ||
Neural Network classification to determine gender based on Waist-to-Hip Ratio | Week 2 | Height measurement & face tracking on Kinect | Week 2 | ||
2 | Neural Network classification & scoring system | Week 3 | Gender classification based on height & shoulder width | Week 3 | |
Physical parameter expansion: neck & shoulder width | Week 3 | Shoulder width & height passed in as parameters,but not neck | Week 3 | Behavioural parameters: hasBag, hasSkirt, hasLongHair (related to neck)coded but not passed in as parameters | |
3 | Gender recognition based on physical & behavioural parameters | Week 4 | Skirt & bag behavioural displayed, but not used for gender recognition | Ongoing | |
Countdown timer | Week 4 | Week 4 | |||
Capturing shopper's outline | Week 4 | Week 4 | Edges refined as well | ||
Capturing of photo | Week 5 | Week 5 | |||
Backward propagation | Week 5 | Week 5 | |||
Saving learning state | Week 5 | Pushed to Iteration 6 | |||
Integration of photo taking with physical gender recognition | Week 5 | Week 5 | |||
4 | Microsoft Tag creation | Week 6 | Week 6 | ||
Advertisement Management System page | Week 6 | Week 6 | |||
Refining image overlaying | Week 6 | Week 6 | |||
Incorporate tag into photo | Week 6 | Week 6 | |||
Gender recognition: physical + behavioural | Week 6 | Week 7 | |||
Integration of gender recognition (physical+behavioural) with photo taking | Week 6 | Week 7 |
Project Metrics
Schedule & Bug Metrics
Team M.O.O.T's schedule and bug metrics can be accessed here.
Gender Recognition Metrics
Our gender recognition metrics can be accessed here.
Project Risks
All risks mentioned during Acceptance Presentation have been mitigated, especially that of technical risks.
Team has also foreseen several new risks:
- storage and transferring of photos
- development delay due to members' unavailability
- inability to respond appropriately to AlterSense
- granular overlaying of augmented background
For more information on these risks, access team's risk management page.
Technical Complexity
Quality of Product
Intermediate Deliverables
Stage | Specification | Modules |
Project Management | Metrics | Schedule & Bug Metrics, Bug Log |
Minutes | Client Meeting,Supervisor Meeting | |
Content | Interaction flow chart | Flow Chart |
Narrative flow | Interactive Content Flow | |
Requirement | Functionality list | Functionalities |
Design | Use Case | Use Case |
Architectural diagram | Architectural Diagram | |
Testing | User Testing 1 documentation | UT1 |
Deployment
Testing
Description | Details |
Date | 24 September 2012 from 12pm to 4.30pm |
Objectives |
|
Scope completed |
|
Testers | 70 testers - 31 females & 39 males |
Execution flow |
1. Get tester to stand at a specific distance away from the Kinect |
Results |
Results of survey form |