HeaderSIS.jpg

Difference between revisions of "IS480 Team wiki: 2012T1 M.O.O.T/Midterm Wiki"

From IS480
Jump to navigation Jump to search
(Removing all content from page)
Line 1: Line 1:
 +
<font face="century gothic" size="2">
  
 +
== <div style="background: #C71585; padding: 15px; font-weight: bold; line-height: 0.3em"><font color= #FFFFFF>Project Progress Summary</font></div>==
 +
 +
Team M.O.O.T has progressed steadily since Iteration 1 -which was kick-started post Acceptance presentation; and is currently in Iteration 4, which will last up to the end of the midterm week. We also encountered a major obstacle in coming up with an alpha version of Artificial Neural Network to determine gender in Iteration 1. There was also a change in client's requirement, contributing to the delay. Confirmation of final requirement was achieved in Iteration 2, enabling team to focus and hence team managed to catch up in Iteration 2.
 +
 +
=== Project Highlights ===
 +
 +
== <div style="background: #C71585; padding: 15px; font-weight: bold; line-height: 0.3em"><font color= #FFFFFF>Project Management</font></div>==
 +
=== Project Status ===
 +
=== Project Schedule ===
 +
=== Project Metrics ===
 +
=== Project Risks ===
 +
=== Technical Complexity ===
 +
 +
== <div style="background: #C71585; padding: 15px; font-weight: bold; line-height: 0.3em"><font color= #FFFFFF>Quality of Product</font></div>==
 +
=== Intermediate Deliverables ===
 +
=== Deployment ===
 +
=== Testing ===
 +
 +
== <div style="background: #C71585; padding: 15px; font-weight: bold; line-height: 0.3em"><font color= #FFFFFF>Reflection</font></div> ==

Revision as of 16:07, 27 September 2012

Project Progress Summary

Team M.O.O.T has progressed steadily since Iteration 1 -which was kick-started post Acceptance presentation; and is currently in Iteration 4, which will last up to the end of the midterm week. We also encountered a major obstacle in coming up with an alpha version of Artificial Neural Network to determine gender in Iteration 1. There was also a change in client's requirement, contributing to the delay. Confirmation of final requirement was achieved in Iteration 2, enabling team to focus and hence team managed to catch up in Iteration 2.

Project Highlights

Project Management

Project Status

Project Schedule

Project Metrics

Project Risks

Technical Complexity

Quality of Product

Intermediate Deliverables

Deployment

Testing

Reflection