Difference between revisions of "IS480 Team wiki: 2012T1 Evynty Project Progress"

From IS480
Jump to navigation Jump to search
 
(16 intermediate revisions by 2 users not shown)
Line 5: Line 5:
  
 
<!--Navigation-->
 
<!--Navigation-->
 +
{| style="background-color:#ffffff; color:#ffffff padding:5px 0 0 0;" width="150" cellspacing="0" cellpadding="0" align="center" valign="top" border="0"|
 +
| width="1%" | &nbsp;
 +
 +
| style="padding: 0.3em; font-size:90%; border:4px solid #DD0A2D; text-align:center; background-color:#075EDD;" width="12%" | [[IS480_Team_wiki:_2012T1_Evynty_Project_Progress| <font color="#ffffff">Progress</font>]]
 +
|}
 +
<br />
 
{| style="background-color:#ffffff; color:#ffffff padding:5px 0 0 0;" width="100%" cellspacing="0" cellpadding="0" valign="top" border="0"|
 
{| style="background-color:#ffffff; color:#ffffff padding:5px 0 0 0;" width="100%" cellspacing="0" cellpadding="0" valign="top" border="0"|
 
| width="1%" | &nbsp;
 
| width="1%" | &nbsp;
Line 59: Line 65:
 
[[IS480_Team_wiki:_2012T1_Evynty Project Progress#Reflection|<font color="#ffffff">Reflection</font>]]  
 
[[IS480_Team_wiki:_2012T1_Evynty Project Progress#Reflection|<font color="#ffffff">Reflection</font>]]  
 
|}
 
|}
 +
 +
 +
 +
===Final Presentation Slides===
 +
----
 +
Please download our Final Presentation Slides [[Media:Evynty Final Presentation.pdf|here]]
  
  
Line 64: Line 76:
 
----
 
----
  
Since our Mid Term Presentation, Evynty has embarked 3 Sprints of Development. Sprint 3 took place from '8 October 2012 to 28 October 2012' and Sprint 4 took place from '5 November 2012 to 18 November 2012'. The gap between Sprint 3 and 4 was dedicated to making changes from the User Testing Evynty conducted with Venue owners from 22-24 October 2012. Sprint 5 took place from '19 November to 2 December 2012'. With the completion of these three sprints and their respective User Testings, functions on Evynty are:<br />
+
Since our Mid Term Presentation, Evynty has embarked 3 Sprints of Development. Sprint 3 took place from '8 October 2012 to 28 October 2012' and Sprint 4 took place from '5 November 2012 to 18 November 2012'. The gap between Sprint 3 and 4 was dedicated to making changes from the User Testing Evynty conducted with Venue owners from 22-24 October 2012. Sprint 5 took place from '19 November to 28 November 2012'. With the completion of these three sprints and their respective User Testings, functions on Evynty are:<br />
 
{| cellpadding=15
 
{| cellpadding=15
 
|-
 
|-
Line 84: Line 96:
 
|| <li> Search Filtering
 
|| <li> Search Filtering
 
<li> Messaging
 
<li> Messaging
<li> HTTPS site
 
 
|}
 
|}
 
<!-- Place your Final slides link and deployed site link here
 
<!-- Place your Final slides link and deployed site link here
Line 146: Line 157:
 
===Project Schedule (Plan Vs Actual):===
 
===Project Schedule (Plan Vs Actual):===
  
The project was planned with 6 Sprints in total. Except for Sprint 0 and 5, most Sprints are a duration of 3 weeks. Sprint 0 is development planned for acceptance, where things did not turned out as they were planned. Evynty were rejected due to the lack of specificity and development progress. An appeal was planned after that, which triggered the first change of plans, causing Sprint 0 to be stretched to include development for the appeal presentation. In Sprint 1; first 3 weeks of 2012-13 Term 1, there was a change of plan, where the implementation of [http://backbonejs.org backbone] was decided to be delayed and kept tentative due to its complexity. There were no major change of plans in Sprint 2, though both Sprints had its own delays. Refer below
+
Since our mid term presentation, 3 Sprints were completed. Except for Sprint 3 which lasted for 3 weeks, Sprint 4 and 5 were of 2 weeks long. Initially, Sprint 4 was planned to be 3 weeks. However, after holding User Testing with our venue owners, there were quite a few changes that needed to be made thus we dedicated 1 week after Sprint 3 to do up the changes. Sprint 5's duration was also shortened after the release of information to freeze this wiki by 28th November 2012. User Testing dates and improvement operations was shifted earlier to complete by that date in order to complete the wiki.  
  
Click [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Project_Management#Sprint_Features_Dev. here] to see what features were planned for the Sprint, and which were completed. View also the planned and actual project schedule through gantt charts of Evynty below:
+
Throughout the last 3 Sprints, the interaction the team had with our venue owners (beta partners), allowed us to design a system that is liked by our venue owners.
 +
 
 +
Click [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Project_Management#Sprint_Features_Dev. here] to see what features were planned for each Sprint, and what were completed. View also the planned and actual project schedule through gantt charts of Evynty below:
  
 
{|class="wikitable" style="text-align: center"
 
{|class="wikitable" style="text-align: center"
Line 164: Line 177:
 
|-
 
|-
 
| 3 || [[Media:Evynty Sprint 3 Planned Schedule.docx | View]] || [[Media:Evynty Sprint 3 Actual Schedule.docx | View]] || <li> Completed everything on time<li> User Testing was held for a longer period to accommodate venue owner's requests and schedule
 
| 3 || [[Media:Evynty Sprint 3 Planned Schedule.docx | View]] || [[Media:Evynty Sprint 3 Actual Schedule.docx | View]] || <li> Completed everything on time<li> User Testing was held for a longer period to accommodate venue owner's requests and schedule
 +
|-
 +
| 4 || [[Media:Evynty Sprint 4 Planned Schedule.docx | View]] || [[Media:Evynty Sprint 4 Actual Schedule.docx | View]] || <li>Completed everything on time<li> Valuable feedback from Venue Owners during testing
 +
|-
 +
| 5 || [[Media:Evynty Sprint 5 Planned Schedule.docx | View]] || [[Media:Evynty Sprint 5 Actual Schedule.docx | View]] || <li> Completed everything on time<li> User Testing was brought forward to meet wiki freeze date<li> https is not implemented as we are not a registered company yet, it would look worst if implemented with a uncertified https
 
|}
 
|}
  
Line 185: Line 202:
 
! scope="col" width=18% | Sprint 5
 
! scope="col" width=18% | Sprint 5
 
|-
 
|-
| <b>Feature Selection</b> || [[Image:Feature Ranking.png | 200px]] || [[Image:Feature Selection Sprint 2.png | 200px]] || [[Image:Evynty Feature Scoring 3.png | 200px]] || [[Image:Evynty 4 Feature Scoring.png |200px]] ||
+
| <b>Feature Selection</b> || [[Image:Feature Ranking.png | 190px]] || [[Image:Feature Selection Sprint 2.png | 190px]] || [[Image:Evynty Feature Scoring 3.png | 190px]] || [[Image:Evynty 4 Feature Scoring.png |190px]] || [[Image:Evynty 5 Feature Scoring.png | 190px]]
 
|-
 
|-
| <b>Sprint Performance</b> || [[Image:Sprint Velocity.png |200px]] || [[Image:Screen Shot 2012-10-03 at 2.39.13 PM.png | 200px]] || [[Image:Evynty Sprint Velocity 3.png | 200px]] || [[Image:Evynty 4 Sprint Progress.png | 200px]] ||
+
| <b>Sprint Performance</b> || [[Image:Sprint Velocity.png |190px]] || [[Image:Screen Shot 2012-10-03 at 2.39.13 PM.png | 190px]] || [[Image:Evynty Sprint Velocity 3.png | 190px]] || [[Image:Evynty 4 Sprint Progress.png | 190px]] || [[Image:Evynty 5 Sprint Progress.png | 190px]]
 
|-
 
|-
| <b>Bug</b> || - || [[Image:Evynty Bug Metrics 1.png | 200px]] || [[Image:Evynty Bug Metrics3.png | 200px]] || [[Image:Evynty 4 Bug Metrics.png | 200px]] ||
+
| <b>Bug</b> || - || [[Image:Evynty Bug Metrics 1.png | 190px]] || [[Image:Evynty Bug Metrics3.png | 190px]] || [[Image:Evynty 4 Bug Metrics.png | 190px]] || [[Image:Evynty 5 Bug Metrics.png | 190px]]
 
|-
 
|-
| <b>Project Performance</b> || [[Image:Project Velocity.png | 200px]] || [[Image:Evynty 2 Project Progress.png|200px]] || [[Image:Evynty Project Velocity 3.png | 200px]] || [[Image:Evynty 4 Project Performance.png | 200px]] ||
+
| <b>Project Performance</b> || [[Image:Project Velocity.png | 190px]] || [[Image:Evynty 2 Project Progress.png|190px]] || [[Image:Evynty Project Velocity 3.png | 190px]] || [[Image:Evynty 4 Project Performance.png | 190px]] || [[Image:Evynty 5 Project Progress.png | 190px]]
 
|-
 
|-
| <b>Project Success</b> || [[Image:Project Success after Sprint 1.png | 200px]] || [[Image:Evynt 2 Project Success.png|200px]] || [[Image:Evynty Project Success 3.png | 200px]] || [[Image:Evynty 4 Project Success.png | 200px]] ||
+
| <b>Project Success</b> || [[Image:Project Success after Sprint 1.png | 190px]] || [[Image:Evynty Project Success 2.png | 190px]] || [[Image:Evynty Project Process 3.png | 190px]] || [[Image:Evynty 4 Project Success.png | 190px]] || [[Image:Evynty 5 Progress Success.png | 190px]]
 
|}
 
|}
  
Line 231: Line 248:
 
|rowspan="3"| Analysis || Use case || Refer to the list of use cases [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Documentation#Use_Cases here]
 
|rowspan="3"| Analysis || Use case || Refer to the list of use cases [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Documentation#Use_Cases here]
 
|-
 
|-
| Business Process Diagram || to do
+
| Business Process Diagram || Refer to our Business Process Flow [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Project_Overview#The_Business_Process here]
 
|-
 
|-
 
| UI Evolution || Follow our Design Evolution [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Documentation#User_Interface_Evolution here]
 
| UI Evolution || Follow our Design Evolution [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Documentation#User_Interface_Evolution here]
Line 239: Line 256:
 
| System Diagram || Refer to our System Diagram here [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Documentation#System_Diagram here]
 
| System Diagram || Refer to our System Diagram here [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Documentation#System_Diagram here]
 
|-
 
|-
| Testing || Test plan || [[Media:Evynty Test Cases Sprint 2.xlsx | Download]] the Test cases we perform internally
+
| Testing || Test plan || [[Media:Evynty Test Cases.xlsx | Download]] the Test cases we perform internally
 
|}
 
|}
  
Line 260: Line 277:
 
===Testing:===
 
===Testing:===
  
In testing our system, we have created a checklist format [[Media:Evynty Test Cases Sprint 2.xlsx | Test Case]] document for internal testing. Tests need to return positive before User Testing is conducted. In addition, to achieve a bug free environment, we make use of  a bug metric to determine keep track and monitor the health of our system. Refer to our metrics in the [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Project_Progress#Project_Management Project Management] section above.<br />
+
In testing our system, we have created a checklist format [[Media:Evynty Test Cases.xlsx | Test Case]] document for internal testing. Tests need to return positive before User Testing is conducted. In addition, to achieve a bug free environment, we make use of  a bug metric to determine keep track and monitor the health of our system. Refer to our metrics in the [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Project_Progress#Project_Management Project Management] section above.<br />
 
Four User Testing will be conducted:
 
Four User Testing will be conducted:
 
<ul>
 
<ul>
Line 275: Line 292:
 
</ul>
 
</ul>
  
Results from the User Testing will be logged and findings will be analyzed and changes will be made. Refer [[Media:Evynty User Testing Collation - Sprint 2.pdf| here]] for our findings from User Testing 1. To go into detail as to how we do our User Testing and findings, refer to our [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Usability_Studies Usability Study] section.
+
Results from the User Testing will be logged and findings will be analyzed and changes will be made. To find out details as to how we do our User Testing and findings, refer to our [https://wiki.smu.edu.sg/is480/IS480_Team_wiki:_2012T1_Evynty_Usability_Studies Usability Study] section.
  
 
===Reflection===
 
===Reflection===
Line 282: Line 299:
 
===Team Reflection:===
 
===Team Reflection:===
  
The team started the project with most members unfamiliar with the language and management methodology. Knowing the advantages from them, the team is considerably competent in them now, showing great improvement. Referring back to the lessons we would like to learn (following), most of them are realized, showing great improvement.<br/>
+
Looking back, the team started out this project with technologies we were new to. However, knowing its benefits, our perseverance paid off as the development team were able to climb the ropes and be competent in each of their areas. Throughout the whole project, team dynamics and structure has been changing constantly in order to achieve greater productivity. One of the major changes that allowed higher productivity was the identification of individual strengths and weaknesses, and switching Brendon's role from implementation of features to pure Design Development.
 +
 
 +
The team has came a long way together. We started our as friends, and now we have grown into a team. Learning objectives that we set out to accomplish are all accomplished, marking a good chapter Evynty in the IS480, FYP project. <br/>
 
<ul>
 
<ul>
 
<li> To pick up new computing language (Python) that can build on our programming knowledge
 
<li> To pick up new computing language (Python) that can build on our programming knowledge
Line 299: Line 318:
  
 
<b>''Xander''</b><br />
 
<b>''Xander''</b><br />
 +
''Final:''<br />
 +
After our mid term presentation, things started to pick up really quickly as work load from other modules increases, causing team members to divert more attention away from the project. As a result, I had to learn take their time table and work load from other modules into consideration of the number of work that should be realistic done from sprint 3-5. I have also learnt to plan things much more pessimistically as it would not only show a bad progress, but also decrease the team's morale when results reveal themselves at the end of each sprint.
 +
 +
Throughout the duration of the project, I have also learnt to switch roles between being a leader and manager of the FYP project, as well as to drive the direction, and sales and marketing efforts to get venues into the system through acquiring beta partners into Evynty. Being able to set up meetings with IIE together with the IS480 community, and eventually got the support of IIE was really great for the team. Our morale and confidence was boosted by the acceptance from IIE and the readiness to apply for the ACE grant. However, at the same time, I had to stay alert to make sure that things are being completed and done for the FYP project.
 +
 +
Overall, it has been a really great experience. I have learnt from my peers of how to become a better project manager, get to know each of them more and now we can work much more efficiently together compared to our mid point, after gaining much experience throughout our journey on the project together.
 +
 +
''Mid Term:''<br />
 
I have taken on the role of a project manager for the team and since then it has been a very exciting journey. I needed to learn how to handle each member individually and collectively in order to ensure proper communication in the team. When problems arise or there is work needed to be done, I need to learn to filter them and see what are the ones with high priority, and shield/postpone the rest till a suitable time. I have definitely learnt how to manage the schedule of the project, and how to use different appropriate tools to monitor and assess the progress of the team. This is one area that I need to constantly improve as well, as there is always a better and more efficient way of managing the projects. As time goes by, I would also want to learn more front end development and help out in more development as it is one of the critical factors of success of Evynty.
 
I have taken on the role of a project manager for the team and since then it has been a very exciting journey. I needed to learn how to handle each member individually and collectively in order to ensure proper communication in the team. When problems arise or there is work needed to be done, I need to learn to filter them and see what are the ones with high priority, and shield/postpone the rest till a suitable time. I have definitely learnt how to manage the schedule of the project, and how to use different appropriate tools to monitor and assess the progress of the team. This is one area that I need to constantly improve as well, as there is always a better and more efficient way of managing the projects. As time goes by, I would also want to learn more front end development and help out in more development as it is one of the critical factors of success of Evynty.
 +
  
 
<b>''Nikunj''</b><br />
 
<b>''Nikunj''</b><br />
 +
''Final:''<br />
 +
This FYP has been a great journey. I have faced several challenges in the implementation of Evynty. When I first had the idea, I really expected it to be much simpler task. However, complications that have arisen in terms of resources and changes in the scope of what Evynty is supposed to do after rounds of market research have made this a truly challenging project. That being said, despite remodeling and writing the same features over and over, I believe that we have finally manages to push Evynty into the right direction and white-space in the market.
 +
 +
Personally, I have learnt tremendous lessons both from the point of view of a developer and an entrepreneur. I am now fluent in writing code in python. Before this project, I only knew bits and pieces of it. I am also proud to say that I have a deep understanding of the Django framework. After spending hours refactoring code to make it more sensible and organized I have truly taken strides in writing usable django apps. From the point of view of an entrepreneur, I have met up with people who would love to use Evynty, and with investors who think this is an idea with great potential. It has been a challenge to change things in order to meet the needs of different stakeholders but it has been useful in teaching me invaluable lessons in dealing with stakeholders.
 +
 +
This FYP has been a great journey and has been a good start for Evynty. There is true potential in this idea and I am excited to take this further with the help of IIE and ACE.
 +
 +
''Mid Term:''<br />
 
Over the past 10 weeks I learnt a lot of technical stuff. Figured out how to do many cool things in django and python and learnt how to do useful things like setting up a git repository on a remote server. I improved my skills in dealing with linux systems. Other than the technical aspects, I learnt a lot about starting tech companies. I learnt from approaching customers are finding out about the features that they would like to see in the website. I also learnt about how one should validate the idea and source for beta customers.
 
Over the past 10 weeks I learnt a lot of technical stuff. Figured out how to do many cool things in django and python and learnt how to do useful things like setting up a git repository on a remote server. I improved my skills in dealing with linux systems. Other than the technical aspects, I learnt a lot about starting tech companies. I learnt from approaching customers are finding out about the features that they would like to see in the website. I also learnt about how one should validate the idea and source for beta customers.
  
 
Over the rest of the sem, I want to be able to continue doing what I have been doing. I also want to learn more about the front-end development that I have not touched at all.
 
Over the rest of the sem, I want to be able to continue doing what I have been doing. I also want to learn more about the front-end development that I have not touched at all.
 +
  
 
<b>''Yik Sean''</b><br />
 
<b>''Yik Sean''</b><br />
 +
''Final:''<br />
 +
Personally embarking on an IS480 project has been a great learning experience for me, especially after watching seniors' presentations for the past two years. I learnt that team communication and project management are two major aspects which determines the success of an IT project. Having involved in various roles throughout the project cycle, I gained insights to the overall project management and development as well as the importance of supporting team members positively. By ensuring proper and consistent communication, team dynamics can be transformed into an advantageous attribute instead of hindering project progress.
 +
 +
In terms of system development, code quality proved to be of utmost important as robust codes ease code management and allow changes to be made seamlessly without system interruptions. I would have never realised how crucial communication plays a part in ensuring common understanding between all stakeholders of the IT system as well as how business requirements can influence system complexity if not for this project. All in all, I have achieved my goals set out in undertaking IS480 to learn and benefit from the hands on experience to develop a complete, quality IT system.
 +
 +
''Mid Term:''<br />
 
As of midterm, I have learnt that being the intermediary between the front end and back end is not an easy task as experienced from creation of API to enable a restful website. Also, thorough testing is time-consuming but critical portion in ensuring quality in the system being built. Potential key areas for growth and improvement would be to facilitate more consistent communication between both front end and back end in order to have a clearer overall picture and requirements in order to prevent duplication of tasks and redundancy. As a backend developer and tester, I would say this has been a very exciting role as it is challenging especially when having to work as a middleman with conflicting requirements from both sides of the system as well as meticulous effort required to test the system in order to deliver a quality product.
 
As of midterm, I have learnt that being the intermediary between the front end and back end is not an easy task as experienced from creation of API to enable a restful website. Also, thorough testing is time-consuming but critical portion in ensuring quality in the system being built. Potential key areas for growth and improvement would be to facilitate more consistent communication between both front end and back end in order to have a clearer overall picture and requirements in order to prevent duplication of tasks and redundancy. As a backend developer and tester, I would say this has been a very exciting role as it is challenging especially when having to work as a middleman with conflicting requirements from both sides of the system as well as meticulous effort required to test the system in order to deliver a quality product.
 +
  
 
<b>''Wen Rui''</b><br />
 
<b>''Wen Rui''</b><br />
 +
''Final:''<br />
 +
I learnt quite a lot the last few weeks of FYP because we had to constantly update our codes to reflect what our consumers want. Although at times it is quite depressing to keep changing, as though it is never ending, when it is finally done up to what the client wants, it brings up a sense of enjoyment. As mentioned before, because the FYP is one that is self-proposed, we have to be dependent on ourselves to push ourselves to not go the easy way and to do things that are best for any given situation. May it be the solution is very difficult to implement or time consuming to implement, when it has to be done, it has to be done.
 +
 +
Moving along the tight schedule, there is more in depth sense of commanderie. More so with part of the team that have to work closely together to make things happen. I’ve also learnt a lot more in terms of communication where at first I could not get my thoughts through to the others, and now I’m more able to do so. I’ve also more experienced in time management. Although the amount of modules did not increase, the amount of work due towards the end of semester always increases. In addition to the changing of requirements for the FYP, it is essential that time is not wasted to ensure that most can be done with the little time that we have.
 +
 +
However one thing I would like is to have better plan each step of the FYP. It always seem that everybody understands what was discussed during the planning meeting, however when it comes to actually doing, we almost always realized that we have missed out some things during the planning. Overall, I think the FYP has given me a lot of experience in terms of working in a team and in a project that is self-proposed. It really makes me constantly think of ways to improve the system because there is no one  (client) to guide us and our grades are very well dependent on ourselves.
 +
 +
''Mid Term:''<br />
 
Learnt how to work with others, especially people that I know but have not worked together before. New programming language and to use javascript libraries that i have never used before. Would be good if i am more patient with others and to not let personal matters take over when in frustration with others. Took up the responsibility to ensure that the front end team progress without helping them do their work for them. Initiate discussions on how to improve the system with documentations such as the storyboard to ensure that everyone is on the same page. Would have liked that I have more balance between work, life and FYP.  
 
Learnt how to work with others, especially people that I know but have not worked together before. New programming language and to use javascript libraries that i have never used before. Would be good if i am more patient with others and to not let personal matters take over when in frustration with others. Took up the responsibility to ensure that the front end team progress without helping them do their work for them. Initiate discussions on how to improve the system with documentations such as the storyboard to ensure that everyone is on the same page. Would have liked that I have more balance between work, life and FYP.  
 +
  
 
<b>''Brendon''</b><br />
 
<b>''Brendon''</b><br />
 
My key areas of learning are CSS, HTML, Javascript (Jquery, AJAX), integration with Django. Some of the key areas of growth and improvement are javascript, django integration. In this project, I have took up the responsibility to assist in front end designing. Since the start, I have put in good effort put in and contributions: picking up almost an entirely new programming language and getting better with it each and every single day. Contribute to 90% of the look and feel of the website. I have learnt to never stop asking when in doubt, and try not to ask similar question. Realized the importance of communications within a team as without proper communications and SOP (standard operating procedures), things will not get done. Ask when in doubt, always good to ask then to assume.
 
My key areas of learning are CSS, HTML, Javascript (Jquery, AJAX), integration with Django. Some of the key areas of growth and improvement are javascript, django integration. In this project, I have took up the responsibility to assist in front end designing. Since the start, I have put in good effort put in and contributions: picking up almost an entirely new programming language and getting better with it each and every single day. Contribute to 90% of the look and feel of the website. I have learnt to never stop asking when in doubt, and try not to ask similar question. Realized the importance of communications within a team as without proper communications and SOP (standard operating procedures), things will not get done. Ask when in doubt, always good to ask then to assume.
 +
  
 
<b>''Xue Ting''</b><br />
 
<b>''Xue Ting''</b><br />
 +
''FInal:''<br />
 +
Communication is very important to prevent conflicts and for better
 +
facilitation of the project. Time management is also very important and through scrum, I find it very useful as it ensures that the team follows the proposed schedule and meet the milestones in each short sprint.
 +
I have also learnt that discussions should always be keep open so as to allow constructive feedback to each other.
 +
 +
''Mid Term:''<br />
 
I've picked up photoshop designing skill. I feel that I've to work more on my time management and produce work meeting deadlines. I realized that communication between the front end coders and me is very crucial as theres no point designing something that cant be implemented. I'm in charge of designing the website and as of now, the website ui is not quite there yet but hopefully after midterm, with better time management and communication with the team, the designs will get better.
 
I've picked up photoshop designing skill. I feel that I've to work more on my time management and produce work meeting deadlines. I realized that communication between the front end coders and me is very crucial as theres no point designing something that cant be implemented. I'm in charge of designing the website and as of now, the website ui is not quite there yet but hopefully after midterm, with better time management and communication with the team, the designs will get better.

Latest revision as of 22:52, 3 December 2012

Logo 2 - confirmed.png


  Progress


  Home   Team   Project Overview   Project Management   Usability Studies   Documentation   Resource & References


 

Project Progress Summary

 

Project Management

 

Quality of product

 

Reflection


Final Presentation Slides


Please download our Final Presentation Slides here


Project Progress Summary


Since our Mid Term Presentation, Evynty has embarked 3 Sprints of Development. Sprint 3 took place from '8 October 2012 to 28 October 2012' and Sprint 4 took place from '5 November 2012 to 18 November 2012'. The gap between Sprint 3 and 4 was dedicated to making changes from the User Testing Evynty conducted with Venue owners from 22-24 October 2012. Sprint 5 took place from '19 November to 28 November 2012'. With the completion of these three sprints and their respective User Testings, functions on Evynty are:

  • Login/ Register
  • Forgot Username/Password
  • Dashboard
  • Account Settings
  • Notifications
  • Venue & Package Creation
  • Manage Venue
  • Manage Schedule
  • Manage Packages
  • Splash Page
  • Venue Search
  • Search Results
  • Venue Booking
  • Manage Bookings
  • Reviews
  • Search Filtering
  • Messaging
  • Project Highlights:

    The project ran went through several ups and downs during its duration. Obstacles were faced and overcame, highlights were experienced and shared. Click here to view all the highlights the team went through.

    Project Challenges:

    Two major challenges was encountered during the duration of Evynty IS480 project.

    1. During the process of acquiring venues into the Evynty system amidst development

    The game plan acquiring venue owners in the system changed from producing a perfect product for the market, to creating a Minimum Viable Product (MVP) in order to gain the interests of venue owners. When approaching venue owners, they were introduced to Evynty and the opportunity to become our beta partner, where they will be enjoying certain perks for a duration of 1 year. As venues to be listed in Evynty had to be unique, the quality of interaction and filtering of venues had to be of top quality, especially in the early stages of Evynty as it sets the stage for future potential and direction.

    The team faced multiple rejections, and these rejections did not come easy. Not only did we had to manage the process during school, our efforts were not met with welcoming arms, which creates certain doubts in the project.

    Through persistent and learning from experience, the team nailed the first beta partner who were willing to be a long term business partner in early October. This success gave confidence into the team and subsequently a few other venues agreed to be our beta partners. Since then, constant communication and testing are conducted with our beta partners to improve the usability and business impact of Evynty.

    2. During acceptance, where we were rejected after our acceptance presentation

    It was a smooth sailing journey all the way to our acceptance. The team did a mock presentation to our supervisor 1 week before our presentation, and got the green light that it was ready for our idea to be accepted as a FYP project. Though we did not get accepted after our acceptance presentation, the team was determined to make it work as we know that we had the capabilities to. Thus we identified what went wrong and what was missing from our project and started work on it immediately. The team stayed together for three days straight to work on Evynty, delivering functions such as homepage, login, register, dashboard management, search results and sample venue profile. An acceptance appeal was held to our supervisor afterwards, and our project was then accepted.

    The team learnt a valuable lesson from this experience. That we should never assume that things will go our way, and we should always be prepared for the worst scenario, anticipate it and make sure mitigation plans are in place to make it work.

    Project Achievements:

    Supported by IIE:
    Addressing a pain faced by many when organizing an event, or planning a special day with their special people, Evynty is supported by SMU IIE. The space that Evynty is tackling, online event management, is something that is missing in today's world as celebration becomes more of a social norm. Evynty is proud to be supported by IIE, and we would soon be applying for a grant fro Spring Singapore through IIE, and be incubated.


    Creating a Web App that is actually used by real users and solves a pain:
    Real life and actual venues are present in Evynty, where real people (venue seekers) can now search, compare and book venues and packages for their special occasions. Not only are we doing a project under IS480, by being able to acquire real users (venue owners) into the system to list and manage their business through Evynty, is a great achievement for the whole team.


    Beta Partners:
    Believing in our project, the team was able to secure several beta partners who are venue owners, who will be with us throughout our journey; idea sharing -> development -> launch. These venue owners will witness the progress of our product and service since the beginning, and providing us valuable feedback to make Evynty better.


    Methods and processes:
    Bi-weekly updates: The team found that the bi-weekly updates of current status and progress of individuals and the team as a whole allows them to understand the current situation better. As the SCRUM framework is adopted, the team only meet on a need basis. Thus by having the bi-weekly updates, it allows everyone to be be aware of critical activities.


    Teamwork:
    Team Bonding: The team meets for badminton every Wednesday of the week, and this allowed everyone to take time off school and work on the project to relax our brains and body. After the session every week, the team feel much refreshed to continue work again.


    Project Management


    This section describes briefly some of the project management aspects of Evynty. For full description of Evynty's Project Management, tools and progress, click here.

    Project Schedule (Plan Vs Actual):

    Since our mid term presentation, 3 Sprints were completed. Except for Sprint 3 which lasted for 3 weeks, Sprint 4 and 5 were of 2 weeks long. Initially, Sprint 4 was planned to be 3 weeks. However, after holding User Testing with our venue owners, there were quite a few changes that needed to be made thus we dedicated 1 week after Sprint 3 to do up the changes. Sprint 5's duration was also shortened after the release of information to freeze this wiki by 28th November 2012. User Testing dates and improvement operations was shifted earlier to complete by that date in order to complete the wiki.

    Throughout the last 3 Sprints, the interaction the team had with our venue owners (beta partners), allowed us to design a system that is liked by our venue owners.

    Click here to see what features were planned for each Sprint, and what were completed. View also the planned and actual project schedule through gantt charts of Evynty below:

    Sprint Planned Schedule Actual Schedule Comments
    0 View View
  • Acceptance Appeal
  • 1 View View
  • Xueting being overseas
  • Under estimation of time required for tasks
  • Postponing implementation of backbone
  • 2 View View
  • User Testing to be done before Mid Term Presentation
  • 3 View View
  • Completed everything on time
  • User Testing was held for a longer period to accommodate venue owner's requests and schedule
  • 4 View View
  • Completed everything on time
  • Valuable feedback from Venue Owners during testing
  • 5 View View
  • Completed everything on time
  • User Testing was brought forward to meet wiki freeze date
  • https is not implemented as we are not a registered company yet, it would look worst if implemented with a uncertified https

  • You can also follow our progress bi-weekly by downloading our bi-weekly progress updates here.

    Project Metrics:

    For a full view of the set of Project Management Tools of now Evynty Tracks its performance and progress, click here.

    Below is a list of public metrics that Evynty uses you can follow:

    Metric Sprint 1 Sprint 2 Sprint 3 Sprint 4 Sprint 5
    Feature Selection Feature Ranking.png Feature Selection Sprint 2.png Evynty Feature Scoring 3.png Evynty 4 Feature Scoring.png Evynty 5 Feature Scoring.png
    Sprint Performance Sprint Velocity.png Screen Shot 2012-10-03 at 2.39.13 PM.png Evynty Sprint Velocity 3.png Evynty 4 Sprint Progress.png Evynty 5 Sprint Progress.png
    Bug - Evynty Bug Metrics 1.png Evynty Bug Metrics3.png Evynty 4 Bug Metrics.png Evynty 5 Bug Metrics.png
    Project Performance Project Velocity.png Evynty 2 Project Progress.png Evynty Project Velocity 3.png Evynty 4 Project Performance.png Evynty 5 Project Progress.png
    Project Success Project Success after Sprint 1.png Evynty Project Success 2.png Evynty Project Process 3.png Evynty 4 Project Success.png Evynty 5 Progress Success.png

    Technical Complexity:

    Customizing Django's core apps to meet Evynty's needs Django's core apps come with a lot of useful functionality. They are also a dependency for several 3rd party apps. Thus, it makes sense to use them. An example of a core app would be auth.user that implements the SessionMiddleware. However, implementing it as it comes is not sufficient for our needs and we have to make customizations such as using emails instead of usernames, ensuring emails are unique and verified and extending the length of the certain fields. Yes, all this sounds extremely simple to change. However, the challenge is in doing all of this without touching the source code of django's apps! It is not recommended to touch django's source code for the obvious reason that a lot of things in django might break if you unknowingly start to customize it for your own needs.

    So, we had to use a signals system to implement these changes. By adding a signals layer, we essentially have a middleware that listens to signals which tell us when a particular type of object is saved or retrieved. We then modify the data in order to trick django into thinking it is getting what the core app wants but we are actually customizing the data for our needs. This was a challenge.

    Mimicking a Google Calendar-like functionality for venue schedules For the venues to mark their schedules as available or not, we had to mimic the functionality that one sees in google calendar. We used a highly optimal database structure to store availability events that could be recurring. We then had to use complex processing to get, edit or split these events. A lot of cases had to be considered and carefully thought out before they could be functional.

    Building an app on Django and deploying it on a Unix environment This is rather less complex but learning a huge framework like Django was a challenge for all of us. Also, learning how to deploy an app on Nginx and Apache required reading alot of documentation and a lot of trial and error. This was a big complexity that we faced during the early days of our project as none of us had used a framework/moved a language other than java before.

    Quality of product


    Provide more details about the quality of your work. For example, you designed a flexible configurable system using XML.config files, uses Strategy Design Pattern to allow plugging in different strategy, implement a regular expression parser to map a flexible formula editor, etc.

    Project Deliverables:

    Stage Specification Modules
    Project Management Minutes Refer to Minutes Table here
    Metrics Refer to the list of metrics above
    Requirements Storyboarding Refer to Feature Requirements here
    Analysis Use case Refer to the list of use cases here
    Business Process Diagram Refer to our Business Process Flow here
    UI Evolution Follow our Design Evolution here
    Design ER Diagram Refer to our ER Diagram here
    System Diagram Refer to our System Diagram here here
    Testing Test plan Download the Test cases we perform internally

    Quality:

    Scalability - Scaling can be easily done by the webhosting service that we use. This is abstracted away from our responsibilities. We are using a well renowned hosting service called Webfaction that can scale our apps to our needs.

    Performance - The use of the django framework and its best practices ensures a reasonable level of performance on the website. Besides that, much thought is given to the number of database calls made and all possible attempts are made to minimize the calls. Also, django has a built in cache setup that is used to improve performance. Once again, from the user experience point of view, browsing the website should be speedy and smooth. If a need arises and if this get feedback at UATs saying that the website is slow, attempts will be made to improve performance.

    Reliability, Availability, Fault Tolerance - This is handled by our web hosting client Webfaction. Webfaction is well known and reliable. It has a good reputation in the industry. All responsibility for these requirements is abstracted away from us and towards their managed hosting service.

    Usability - Usability is one of our top priorities and we try to ensure a high level of usability on our website via user-testing and feedback from our beta customers.

    Maintainability - The code is being written in a clean manner strictly adhering to pep8 standards of coding in python. Also django best practices are being followed. Great effort is put into the avoidance of editing code in core or 3rd party apps. Workarounds are used in user apps so that there are no unexpected breaks in the code when additional 3rd party apps are added in the future or if a django version is upgraded.

    Deployment:

    The website is deployed at http://www.evynty.com via FTP before the end of every sprint. There is always a user with the username/email: nikunj.handa@evynty.com that has superuser access to the website under a secure password that will not be revealed on this wiki. If a supervisor needs this password please contact any member of our group.

    Testing:

    In testing our system, we have created a checklist format Test Case document for internal testing. Tests need to return positive before User Testing is conducted. In addition, to achieve a bug free environment, we make use of a bug metric to determine keep track and monitor the health of our system. Refer to our metrics in the Project Management section above.
    Four User Testing will be conducted:

    • In Sprint 2
    • In Sprint 3
    • In Sprint 4
    • In Sprint 5

    Two specific groups will be targeted for Eynty's User Testing. And in each testing, we will aim to have a combined total of 50 participants from the two groups to test our system.

    • Venue Seekers: This group can be anyone who needs a venue or package for an event. They will be using the system to find a venue of their choice, thus they need to enjoy the experience with us in order for them to return to Evynty for their next event.
    • Venue Owners: As the name suggest, people who owns venue would be asked to perform testing to gather feedback from their perspective. As they will be providing the venues and packages, they need to enjoy interacting with the system to encourage them to provide as much information as possible.

    Results from the User Testing will be logged and findings will be analyzed and changes will be made. To find out details as to how we do our User Testing and findings, refer to our Usability Study section.

    Reflection


    Team Reflection:

    Looking back, the team started out this project with technologies we were new to. However, knowing its benefits, our perseverance paid off as the development team were able to climb the ropes and be competent in each of their areas. Throughout the whole project, team dynamics and structure has been changing constantly in order to achieve greater productivity. One of the major changes that allowed higher productivity was the identification of individual strengths and weaknesses, and switching Brendon's role from implementation of features to pure Design Development.

    The team has came a long way together. We started our as friends, and now we have grown into a team. Learning objectives that we set out to accomplish are all accomplished, marking a good chapter Evynty in the IS480, FYP project.

    • To pick up new computing language (Python) that can build on our programming knowledge
    • To learn to incorporate a new framework (Django) into this project
    • To fully utilize open source softwares in pursuit of project completion
    • To be more competent in applying knowledge previously learnt to solve real business problems
    • Use a realistic approach to schedule planning by carefully estimating the efforts and resources required to fulfill the project scope
    • To improve more on project management skills with this large scale project
    • To ensure all group mates are on the same page by constantly updating progress of project through whatsapp group, emails and in meetings
    • To come up with all potential risks for the projects and mitigation steps to improve risk management skills


    Individual Reflection:

    Below are individual reflections by each member of Evynty at the stage of Mid Term.

    Xander
    Final:
    After our mid term presentation, things started to pick up really quickly as work load from other modules increases, causing team members to divert more attention away from the project. As a result, I had to learn take their time table and work load from other modules into consideration of the number of work that should be realistic done from sprint 3-5. I have also learnt to plan things much more pessimistically as it would not only show a bad progress, but also decrease the team's morale when results reveal themselves at the end of each sprint.

    Throughout the duration of the project, I have also learnt to switch roles between being a leader and manager of the FYP project, as well as to drive the direction, and sales and marketing efforts to get venues into the system through acquiring beta partners into Evynty. Being able to set up meetings with IIE together with the IS480 community, and eventually got the support of IIE was really great for the team. Our morale and confidence was boosted by the acceptance from IIE and the readiness to apply for the ACE grant. However, at the same time, I had to stay alert to make sure that things are being completed and done for the FYP project.

    Overall, it has been a really great experience. I have learnt from my peers of how to become a better project manager, get to know each of them more and now we can work much more efficiently together compared to our mid point, after gaining much experience throughout our journey on the project together.

    Mid Term:
    I have taken on the role of a project manager for the team and since then it has been a very exciting journey. I needed to learn how to handle each member individually and collectively in order to ensure proper communication in the team. When problems arise or there is work needed to be done, I need to learn to filter them and see what are the ones with high priority, and shield/postpone the rest till a suitable time. I have definitely learnt how to manage the schedule of the project, and how to use different appropriate tools to monitor and assess the progress of the team. This is one area that I need to constantly improve as well, as there is always a better and more efficient way of managing the projects. As time goes by, I would also want to learn more front end development and help out in more development as it is one of the critical factors of success of Evynty.


    Nikunj
    Final:
    This FYP has been a great journey. I have faced several challenges in the implementation of Evynty. When I first had the idea, I really expected it to be much simpler task. However, complications that have arisen in terms of resources and changes in the scope of what Evynty is supposed to do after rounds of market research have made this a truly challenging project. That being said, despite remodeling and writing the same features over and over, I believe that we have finally manages to push Evynty into the right direction and white-space in the market.

    Personally, I have learnt tremendous lessons both from the point of view of a developer and an entrepreneur. I am now fluent in writing code in python. Before this project, I only knew bits and pieces of it. I am also proud to say that I have a deep understanding of the Django framework. After spending hours refactoring code to make it more sensible and organized I have truly taken strides in writing usable django apps. From the point of view of an entrepreneur, I have met up with people who would love to use Evynty, and with investors who think this is an idea with great potential. It has been a challenge to change things in order to meet the needs of different stakeholders but it has been useful in teaching me invaluable lessons in dealing with stakeholders.

    This FYP has been a great journey and has been a good start for Evynty. There is true potential in this idea and I am excited to take this further with the help of IIE and ACE.

    Mid Term:
    Over the past 10 weeks I learnt a lot of technical stuff. Figured out how to do many cool things in django and python and learnt how to do useful things like setting up a git repository on a remote server. I improved my skills in dealing with linux systems. Other than the technical aspects, I learnt a lot about starting tech companies. I learnt from approaching customers are finding out about the features that they would like to see in the website. I also learnt about how one should validate the idea and source for beta customers.

    Over the rest of the sem, I want to be able to continue doing what I have been doing. I also want to learn more about the front-end development that I have not touched at all.


    Yik Sean
    Final:
    Personally embarking on an IS480 project has been a great learning experience for me, especially after watching seniors' presentations for the past two years. I learnt that team communication and project management are two major aspects which determines the success of an IT project. Having involved in various roles throughout the project cycle, I gained insights to the overall project management and development as well as the importance of supporting team members positively. By ensuring proper and consistent communication, team dynamics can be transformed into an advantageous attribute instead of hindering project progress.

    In terms of system development, code quality proved to be of utmost important as robust codes ease code management and allow changes to be made seamlessly without system interruptions. I would have never realised how crucial communication plays a part in ensuring common understanding between all stakeholders of the IT system as well as how business requirements can influence system complexity if not for this project. All in all, I have achieved my goals set out in undertaking IS480 to learn and benefit from the hands on experience to develop a complete, quality IT system.

    Mid Term:
    As of midterm, I have learnt that being the intermediary between the front end and back end is not an easy task as experienced from creation of API to enable a restful website. Also, thorough testing is time-consuming but critical portion in ensuring quality in the system being built. Potential key areas for growth and improvement would be to facilitate more consistent communication between both front end and back end in order to have a clearer overall picture and requirements in order to prevent duplication of tasks and redundancy. As a backend developer and tester, I would say this has been a very exciting role as it is challenging especially when having to work as a middleman with conflicting requirements from both sides of the system as well as meticulous effort required to test the system in order to deliver a quality product.


    Wen Rui
    Final:
    I learnt quite a lot the last few weeks of FYP because we had to constantly update our codes to reflect what our consumers want. Although at times it is quite depressing to keep changing, as though it is never ending, when it is finally done up to what the client wants, it brings up a sense of enjoyment. As mentioned before, because the FYP is one that is self-proposed, we have to be dependent on ourselves to push ourselves to not go the easy way and to do things that are best for any given situation. May it be the solution is very difficult to implement or time consuming to implement, when it has to be done, it has to be done.

    Moving along the tight schedule, there is more in depth sense of commanderie. More so with part of the team that have to work closely together to make things happen. I’ve also learnt a lot more in terms of communication where at first I could not get my thoughts through to the others, and now I’m more able to do so. I’ve also more experienced in time management. Although the amount of modules did not increase, the amount of work due towards the end of semester always increases. In addition to the changing of requirements for the FYP, it is essential that time is not wasted to ensure that most can be done with the little time that we have.

    However one thing I would like is to have better plan each step of the FYP. It always seem that everybody understands what was discussed during the planning meeting, however when it comes to actually doing, we almost always realized that we have missed out some things during the planning. Overall, I think the FYP has given me a lot of experience in terms of working in a team and in a project that is self-proposed. It really makes me constantly think of ways to improve the system because there is no one (client) to guide us and our grades are very well dependent on ourselves.

    Mid Term:
    Learnt how to work with others, especially people that I know but have not worked together before. New programming language and to use javascript libraries that i have never used before. Would be good if i am more patient with others and to not let personal matters take over when in frustration with others. Took up the responsibility to ensure that the front end team progress without helping them do their work for them. Initiate discussions on how to improve the system with documentations such as the storyboard to ensure that everyone is on the same page. Would have liked that I have more balance between work, life and FYP.


    Brendon
    My key areas of learning are CSS, HTML, Javascript (Jquery, AJAX), integration with Django. Some of the key areas of growth and improvement are javascript, django integration. In this project, I have took up the responsibility to assist in front end designing. Since the start, I have put in good effort put in and contributions: picking up almost an entirely new programming language and getting better with it each and every single day. Contribute to 90% of the look and feel of the website. I have learnt to never stop asking when in doubt, and try not to ask similar question. Realized the importance of communications within a team as without proper communications and SOP (standard operating procedures), things will not get done. Ask when in doubt, always good to ask then to assume.


    Xue Ting
    FInal:
    Communication is very important to prevent conflicts and for better facilitation of the project. Time management is also very important and through scrum, I find it very useful as it ensures that the team follows the proposed schedule and meet the milestones in each short sprint. I have also learnt that discussions should always be keep open so as to allow constructive feedback to each other.

    Mid Term:
    I've picked up photoshop designing skill. I feel that I've to work more on my time management and produce work meeting deadlines. I realized that communication between the front end coders and me is very crucial as theres no point designing something that cant be implemented. I'm in charge of designing the website and as of now, the website ui is not quite there yet but hopefully after midterm, with better time management and communication with the team, the designs will get better.