Difference between revisions of "IS480 Team wiki: 2012T1 6-bit Project Management"
Line 138: | Line 138: | ||
==User Testing== | ==User Testing== | ||
− | + | ===User Testing 1=== | |
+ | [[Image:6bituser-testing1.png]] | ||
+ | |||
+ | ====Test Description==== | ||
+ | The objective of User Test 1 is on functionality and usability testing of the system. The coverage of the test is focused on forum functions. | ||
+ | <br><br> | ||
+ | The purpose of the test is to allow neutral testers to endorse that the system is functioning according to design, or spot any bugs or anomalies. Click data which collects data about a user’s number of clicks or time taken to achieve a task is also collected to understand the experience, and for comparison purposes for future tests. | ||
+ | ====Testers Background==== | ||
+ | There are a total of 20 testers who attended the User Test, of which 60% (12) are male and 40% (8) are female, representing various schools in SMU with SIS students being the majority. There is no stratification in the test users, and testers are selected without any intended bias. It is also observed that most testers are users of Chrome and Firefox web browser. | ||
<br> | <br> | ||
− | User | + | [[Image:6bituser-testing1results.png]] |
− | + | ||
− | + | ====Test Groups==== | |
+ | There is no test grouping employed in this test. | ||
+ | ====Test Procedures==== | ||
+ | Testers are invited to attend the User Test session and required to bring their own laptops. They are informed on the purpose of the test and given a brief description of the system objective of Chapalang!. | ||
+ | Subsequently, they are provided with an instruction sheet for a guided test experience. Testers will be required to perform a series of system tasks based on a test case that will go through all the system features and use-case. Thereafter, testers will answer Yes/No binary questions, and can fill in details in an open-ended textbox appended after each question, should they encounter any bugs or suggestions for improvements. | ||
+ | While the primary method of testing is on direct user experience and feedback, we have also employed secondary method which collects results indirectly. The number of clicks that each user made, together with the click coordinates or link URL, as well as timestamp of each click is captured for analytical purposes. | ||
+ | ====Test Instruction==== | ||
+ | [https://dl.dropbox.com/u/56071797/User%20Testing%201%20Instructions.docx Click Here to Download User Testing 1 Instruction</font>] | ||
=<div style="background: #FF0080; background: -webkit-gradient(linear, left top, left bottom, from(#FF0080), to(#F660AB)); padding: 12px; font-weight: bold; text-align: center "><font color="white" size="6" >Milestones</font></div>= | =<div style="background: #FF0080; background: -webkit-gradient(linear, left top, left bottom, from(#FF0080), to(#F660AB)); padding: 12px; font-weight: bold; text-align: center "><font color="white" size="6" >Milestones</font></div>= |
Revision as of 22:36, 1 December 2012
by offering a place for exchanging ideas and information on its public domain.
http://www.chapalang.com
Final Wikipage |
Home | Technical Overview | Project Deliverables | Project Management | Learning Outcomes |
Schedule
Planned Schedule
Meeting Minutes
Team Meeting Minutes
Supervisor Meeting Minutes
|Meeting Minute 1
|Meeting Minute 2
|Meeting Minute 3
|Meeting Minute 4
|Meeting Minute 5
|Meeting Minute 6
|Meeting Minute 7
|Meeting Minute 8
|Meeting Minute 9
|Meeting Minute 10
|Meeting Minute 11
Testing
Test Cases
Test Plans
Test Plan 1 on 17 September 2012
Test Plan 2 on 28 September 2012
Test Plan 3 on 19 October 2012
Test Plan 4 on 4 November 2012
User Testing
User Testing 1
Test Description
The objective of User Test 1 is on functionality and usability testing of the system. The coverage of the test is focused on forum functions.
The purpose of the test is to allow neutral testers to endorse that the system is functioning according to design, or spot any bugs or anomalies. Click data which collects data about a user’s number of clicks or time taken to achieve a task is also collected to understand the experience, and for comparison purposes for future tests.
Testers Background
There are a total of 20 testers who attended the User Test, of which 60% (12) are male and 40% (8) are female, representing various schools in SMU with SIS students being the majority. There is no stratification in the test users, and testers are selected without any intended bias. It is also observed that most testers are users of Chrome and Firefox web browser.
Test Groups
There is no test grouping employed in this test.
Test Procedures
Testers are invited to attend the User Test session and required to bring their own laptops. They are informed on the purpose of the test and given a brief description of the system objective of Chapalang!. Subsequently, they are provided with an instruction sheet for a guided test experience. Testers will be required to perform a series of system tasks based on a test case that will go through all the system features and use-case. Thereafter, testers will answer Yes/No binary questions, and can fill in details in an open-ended textbox appended after each question, should they encounter any bugs or suggestions for improvements. While the primary method of testing is on direct user experience and feedback, we have also employed secondary method which collects results indirectly. The number of clicks that each user made, together with the click coordinates or link URL, as well as timestamp of each click is captured for analytical purposes.
Test Instruction
Click Here to Download User Testing 1 Instruction
Milestones
Schedule Metric
Bug Metric
Bug Log: |Click Here