Line 378: Line 378:
 
===Individual Reflection===
 
===Individual Reflection===
 
====Gabriel====
 
====Gabriel====
Apart from learning to be more receptive and versatile towards unfamiliar technologies, I have learnt how different technologies can fuse together to provide a holistic business solution.
+
One of the key tenets of the popular 7 Habits of Highly Effective People deals with beginning with the end in mind. Throughout this FYP journey, I learnt that a problem well defined was half the problem solved. The team needed to have a common idea and vision of our deliverables and end product with our client, and defining the requirements was a key factor to our team’s completion. After all, you can’t build something if you don’t know what you’re building right? Moving forward, apart from learning to be more receptive and versatile towards unfamiliar technologies, I have learnt how different technologies can fuse together to provide a holistic business solution.
  
 
====Simon====
 
====Simon====

Revision as of 06:42, 17 April 2014

Project Progress Summary

Progress

100% of the project is completed!

  • All functionalities completed!
  • Completed 12 out of 12 iterations


3 tests have been held

  • Heuristics Test: January 20 - 24
  • Usability Test 1: February 13 - 14
  • Usability Test 2: March 31 - April 4

System is deployed on the live server that OSL will be using in the future!

Test our system here!

Project Timeline

AAN-Brief-Schedule-Final.png

Detailed schedule can be found here!

Project Highlights

  • Changes in requirements
The merging of Message Management and Complaints functionality
Removal of Edit Booking and Delete Booking
  • Working with the different SMU corporate offices
Office of Finance is going to be providing us with a new Paypal account under them which we didn't expect at first!

Project Challenges

  • Liaising with the different stakeholder
Although our main client is OSL, we need a lot of different resources from the various SMU Corporate office to complete our application. During the process, there is a lot waiting time involved since we need to wait for all the different offices to be free as well as find a solution that will satisfy all the stakeholders. E.g. ensure that IITS will be comfortable with maintaining our app in the future
  • Manually drawing all the maps and locker clusters
As we are unable to get the maps from the school offices due to security issues, we have to resort to drawing all the maps personally. The process is extremely tedious as we have to pinpoint the exact location of all the locker clusters and replicate them on maps.
  • Counting the lockers in each cluster
To ensure that we are able to do a theatre-style booking system, we need to take down all the specific location of individual lockers and assign row and columns to each individual lockers to ensure the smooth generation of the locker locations while student are making their bookings.

Project Achievements

  • Supporting the application on three different platforms
  • New and innovative way to book lockers!

Project Management

Project Status

Project Status
Module Function Status Confidence Level Deployment status
CORE Register for LMS
Register Not Completed 1 ×
Sign in
Sign in Completed 1
Booking Management
Add Booking Completed 1
View Booking Completed 1
Edit Booking Removed from functionalities under request of client 1 -
Delete Booking Removed from functionalities under request of client 1 -
Paying for Booking Completed 1
Locker Management
Add Lockers Completed 1
View Lockers Completed 1
Edit Lockers Completed 1
Delete Lockers Completed 1
Search for Lockers
Search Lockers Completed 1
Feedback Management
Report faulty locker Completed 1
View faulty locker reports Completed 1
Update faulty locker status Completed 1
Submit feedback Completed 1
View feedback Completed 1
Update feedback Completed 1
Delete feedback Completed 1
Locker Maintenance Account Management
Add Maintenance team Completed 1
View Maintenance team Completed 1
Edit Maintenance team Completed 1
Delete Maintenance team Completed 1
Statistics Dashboard
View Dashboard Completed 1
Booking Window Management
Set/Open/Close Booking Window timing Completed 1
Set/Edit Booking Timeframe Completed 1
Messaging Management
Send Message Completed 1
Delete Message Completed 1
SECONDARY iPhone App Development
Add locker bookings Completed 1
View Locker Completed 1
Report faulty lockers Completed 1
View map Completed 1
Android App Development
Add locker bookings Completed 1
View Locker Completed 1
Report faulty lockers Completed 1
View map Completed 1

For more information of the respective functions, visit AAN_Project_Management#Project_Status here!

Project Schedule (Plan Vs Actual)

AAN-Actual-Planned-Final-Schedule.png

Iteration Task Reasons for delay/changing iteration Mitigation Plan
10 Payment Web Service When we first started it, we have yet to get the requirements from OSL. Therefore, we will be continuing with the Paypal webservice to ensure what we wants fit into OSL requirements. Continue with Paypal webservice in iteration 11
12 Messaging and Complaints Functionality After UT and discussion with OSL, it is suggested that these two functions should be combined together. Therefore, we added this additional function in the last iteration. Assign the task of coding a new function to a member who isn't busy with changing UI after UT
12 FAQ functionality The client decides that we need a faq page as well as include terms and conditions for students before they start their bookings. Virya and Jerrold to implement the changes

Project Metrics

Schedule Metrics

To know how we calculate our schedule metrics, please refer to this!

Schedule Metric Finals AAN.png

For more information regarding Team AAN's mitigation plan, please refer to here!

Bug Metrics

AAN-Final-BugScore.png AAN-BugCount-Iteration-Finals.png

To know how we calculate our bug metrics, please refer to this!

For more information regarding Team AAN's exact bugs, please look here!

Project Risks

S/N Risk Statement Consequence Likelihood Impact Level Contingency Plan
1 OSL and IITS unable to provide us with list of student email Student will have to create a new account to book lockers High Medium A
  • Use Microsoft/Google webservice as a wya to enable SSO since students can access their email using Outlook and Google accounts
2 Unable to make use of Office of Finance Paypal account Will have to recode our payment system to fit into Ofin's current system or persuade Ofin to create a separate account for OSL High High A * Set a deadline as to when Ofin has to get back to use regarding the account types they support or if they are going to accommodate to our system
3 System will be unable to pass IITS review and thus unable to go live There will be no one to maintain the system for OSL after we finish the project High High A * Pass the codes to IITS by 31st March
  • Do a proper documentation so that OSL will understand how to maintain the system and fix small errors themselves
  • Code is currently running on the server that the client will be using in the future, so there is no issues with deployment

For the complete set of risks we face since the conception of project, please visit here! More information regarding how we measure our risks can also be found on that page.

Technical Complexity

Usability

Front-end validation With front-end validation ensuring that fields such as email, and phone numbers are checked; users can be reassured that what they submit will most likely be sensible!

Pictorial guide for different locker locations in SMU A map is shown for every level of the school which have lockers ensuring that students will know where their lockers are located at. Also, by displaying the exact location of lockers, it makes it easier for students to find their desired lockers.

Instructions for users Instructions as well as terms and conditions will be shown to students every time they attempt to book a locker ensuring that they will be clear of how to use the system as well as some of the basic guidelines for locker booking.

One stop solution for locker bookings

  • Book locker, search for lockers and make all the complaints at one central location.

User Testing is held with students to ensure what we deliver is what they want

  • The 2 UTs provides us with perspectives of how the application can be changed to ensure that users will be able to use it easily and find the process enjoyable.

Maintainability

Utilizes Redhat Open Shift to host our application

OSL will be able to easily upgrade their plans on the website any time they desire.

Aligned our security principles with IITS guidelines so that they can take over our project

After numerous meetings with IITS, we have aligned our project security principles with their requirements to increase the chance of them taking over our project after we are done. We will be submitting our codes to them, and OSL will have to communicate with IITS to ensure that they are willing to take over the project.

Readme guide!

In the event that IITS refuses to take over the project, our team is providing OSL with a read me guide which will teach them how to do basic configurations in the system as well as what the web and phone app can do respectively.


Compatability

Can be used on major browsers such as Chrome, Firefox, and IE

Users are recommended to use only IE9 and above for our web application. Why are we not catering to IE8 and below? IE8 is being used by mostly Windows XP which Microsoft themselves will stop providing updates and help later this year. Therefore, our team doesn't see the need to maintain something that will not be in use soon. Moreover, eLearn’s site is also recommended to be use with IE9 and above.

Scalability

Flexibility

Ability to add new lockers

Lockers that are added into cluster will be automatically reflected when users are choosing their lockers

Security

Token based authentication

Ensures that the password isn't being passed around unnecessarily if the event doesn't call for it.

SSL

Quality of product

Project Deliverables

Stage Specification Modules
Project Management Minutes
Metrics
Requirements Story cards CRUD Customer, Trend Analytic
Analysis Use Case Use Case Diagram
Screen Shots Prototype
Design ER Model ER Model
System Architecture Diagram Architecture Diagram
Testing Heuristic Testing Heuristic Test Results
Usability Test Plan Test Plan
Usability Test 1 Results UT1 Results
Usability Test 2 Results UT2 Results
Handover Manuals User tutorial, Developer manual, Setup manual
Code client server
Deployment Diagram instructions

Deployment

Testing

There are three tests conducted for our system; one Heuristics and two Usability Testing.

In the Heuristics Testing, we aim to find out user's view towards the design of our application so that we can make changes accordingly and ensure that the final product will be of high quality and well-received by everyone.

Heuristics Info:Heuristics Testing


For our first usability test, we will like to find out how well can users navigate our system. This will allow us to further improve on our system and ensure that the end product will be something that is close to dummy proof. Also, since we will be catering the system to the entire SMU, students from other schools participated in our UT too to ensure that we have a diverse and somewhat balanced opinion.

Usability Test 1 Info:Usability Test 1


After our first usability test, we made changes to some parts of the system based on the feedbacks that we have. Furthermore, there is the addition of certain functionalities as well as the iPhone app. Therefore, the second usability test allows us to finetune our project and ensure that our final product will be something that OSL finds satisfactory. Similar to the previous UT, the majority of participants are SMU students since they are the one who will be mainly using the system.

Usability Test 2 Info:Usability Test 2

Reflection

Team Reflection

FYP is a project that is considered long for a school project, and throughout this entire period we have to manage several stakeholders. From our interactions with the stakeholders, we realized that it is extremely important to communicate constantly as well as delivering what we have promised in advance. This will ensure that we keep a nice and friendly friendship for the entire duration. Also, due to the nature of our project, a lot of us dabbled in areas which we are unfamiliar with, further improving our technical capability!

Individual Reflection

Gabriel

One of the key tenets of the popular 7 Habits of Highly Effective People deals with beginning with the end in mind. Throughout this FYP journey, I learnt that a problem well defined was half the problem solved. The team needed to have a common idea and vision of our deliverables and end product with our client, and defining the requirements was a key factor to our team’s completion. After all, you can’t build something if you don’t know what you’re building right? Moving forward, apart from learning to be more receptive and versatile towards unfamiliar technologies, I have learnt how different technologies can fuse together to provide a holistic business solution.

Simon

During the course of this FYP; more significant than the technical skills attained, I have gained invaluable experiences and insights in terms of how a project is managed throughout its life-cycle. From the initial phase of requirements gathering to planning and deciding on what type of development convention and system architecture should be used till the actual deployment, this project has given me first hand knowledge and experience on the full development of a IT project. I learnt to better manage client expectations and balance their changing requirements with the more rigid timeline of the project. One thing I learnt was that communication and information had to flow regularly between the client and the project team. This was to keep the client up to date on the progress as well as help the project team to mitigate the need for major changes if the system deviated too far from the clients expectations. This is a likely scenario if the client was not kept informed on how the system was turning out to be and would very likely result in project delivery delays for the team. The team also had to be flexible and be ready for changes along the timeline.

Overall, I have gained much more than what words can express from this wonderful journey with my team for FYP!

Viet

As the lead developer, I learn to better understand how to design a reliable and flexible system from scratch. Also I have better understanding on web application development including REST web services, Hibernate framework. In addition, I have learnt more about mobile development process in iOS and Android. Finally, I learn about the importance of collaboration among team members to project’s success and integration.

Virya

"You're only wronged when you pity yourself. Think positively and look upon everything with a positive light, then you'll enjoy everything that you're doing right now." This is my mantra during FYP.

I'm someone who likes to plan ahead and ensure that everything will go according to those plans leading to me having excessively high expectations for a lot of things. However, FYP being FYP is not so smooth-sailing. There are a lot of times when I am frustrated because the schedule planned must be altered because of various reasons, or when the outcome of things are different from what I expected. Eventually I've learnt to take things in stride and just plan everything to the best of my ability while dealing with the rest as they come. My mantra actually came to me sometime after midterms when I was upset with everything that is going on in life, and honestly repeating that to myself really makes me feel happier about everything I'm doing! Managing expectations is difficult, but somehow when you have a positive mindset towards everything, all the work seems to be a lot more enjoyable!