Project Manager: Tan Zheng Ming, Kenneth
|
|
Responsibilities
- Plan project schedule and milestones
- Organize, specify and model the business requirements to ensure they are complete and clear
- Oversee project development and keep track of team’s progress
- Ensure proper project documentations (Minutes, Schedules, Diagrams, Team's Wikipedia Page)
- Manage the team
- Liaise with stakeholders and manage their expectations
|
Lead Developer: Lan Ziming
|
|
Responsibilities
- Oversee application’s technical progress
- Coordinate all coding development and conduct quality checks
- Work closely with System Analyst in development / implementation of the application
- Work closely with Lead Designer on building user interface
- Ensure smooth integration of frameworks and technologies used in the project
|
System Analyst: Chen Weifang
|
|
Responsibilities
- Work closely with Lead Developer in translating business requirements into technical requirements
- Design application system and database architecture to align implemented systems with users’ needs
- Oversee all blueprints and technical documentation (Use Cases, Class Diagrams, Sequence Diagram etc.)
- Identifying options for potential solutions and assessing them for both technical and business suitability
- Liaise with stakeholders, testers and a variety of end users to ensure technical compatibility and user satisfaction of the developed system
- Work closely with QA Analyst to implement, configure and test feasible solutions
|
Lead Designer: Chua Chong Thee
|
|
Responsibilities
- Oversee development of front-end application which includes design, interaction and graphical interface
- Design and conceptualize all user interfaces required, making sure the layout is consistent and intuitive
- Create attractive/user-friendly visuals for project in general
- Ensure overall user experience and performance of the developed interface
- Work closely with lead developer for front-end and back-end integration
|
QA Analyst: Chan Qian Ru
|
|
Responsibilities
- Develop testing strategy and plans for the project
- Responsible for managing User Acceptance Testing (UAT), Heuristic Evaluations, test cases and test plans
- Assist PM with minutes taking, documenting the requirements in a format that can be shared with stakeholders
- Ensures quality and performance of the application
- Document feedback from stakeholder and adhere to mitigation plans
- Work closely with System Analyst in collecting and tracking bug metrics for application fixes
|