Internal Testing

As we do not require archiving of previous test cases, we have decided to overwrite the old results with the new results.
The excel contains tabs pertaining to the number of iterations.
For every tab (iterations), we will have test cases on the functionality that were created during that iteration.

Click on this link to download the excel file: [[File:[The_Ikan_Bilis]_Test_Cases.xlsx|thumbnail]]

option

Test Plan

option


External Testing

User Testing 1

Testing Environment:

  • Laboratory Studies, Controller Environment
  • Test conducted at Infosys Lodestone office and is simulated during their office hours

Measurements:

  • Time taken to do a particular task
  • Average number of clicks (some users tend to click randomly)

Testers:

  • Regional Head x 1
  • Senior Principal x 1
  • Consultant x 1


UT In Action:
option option option

Results:

Task No. Function
1 Dashboard
2 User Profile
3 Upload Project Plan
4 Download Project Plan
5 CRUD Risks
6 Assign Project Group


% Difference: Comparison between, regional head vs senior principle and regional head vs consultant.
option

option

Most Common Feedback:

  • Inverted Burn-down Chart (S-Curve)
  • Pop up window when deleting and when functionality is done successfully
  • Difference between “Risk” and “Issues” & Risk function to be more user-friendly
Feedback Before After
Inverted Burn-down Chart (S-Curve) option option
Pop up window when deleting and
when functionality is done successfully
option option
Difference between “Risk” and “Issues” option option


User Testing 2

Testing Environment:

  • Laboratory Studies, Controller Environment
  • Test conducted at Infosys Lodestone office and is simulated during their office hours

Measurements:

  • Time taken to do a particular task

Testers:

  • Consultant x 5


Results:

Task No. Function
1 Dashboard
2 User Profile
3 Upload Project Plan
4 Download Project Plan
5 CRUD Risks
6 Assign Project Group


Most Common Feedback:

  • Current password field when changing password
  • Risk/Issue “R.A.G” algorithm & Filtering
  • Burn down chart Color
  • Edit task within web application
Feedback Before After
Current password field when changing password option option
Risk/Issue “R.A.G” algorithm & Filtering option option
Burn down chart Color option option
Edit task within web application NIL option

User Acceptance Testing

UAT results (compared with UT1 and UT2)

Results:

Task No. Function
1 Dashboard
2 User Profile
3 Upload Project Plan
4 Download Project Plan
5 CRUD Risks
6 Assign Project Group


option
option