Internal Testing
As we do not require archiving of previous test cases, we have decided to overwrite the old results with the new results.
The excel contains tabs pertaining to the number of iterations.
For every tab (iterations), we will have test cases on the functionality that were created during that iteration.
Click on this link to download the excel file: [[File:[The_Ikan_Bilis]_Test_Cases.xlsx|thumbnail]]
Test Plan
External Testing
User Testing 1
Testing Environment:
- Laboratory Studies, Controller Environment
- Test conducted at Infosys Lodestone office and is simulated during their office hours
Measurements:
- Time taken to do a particular task
- Average number of clicks (some users tend to click randomly)
Testers:
- Regional Head x 1
- Senior Principal x 1
- Consultant x 1
Results:
Task No. | Function |
1 | Dashboard |
2 | User Profile |
3 | Upload Project Plan |
4 | Download Project Plan |
5 | CRUD Risks |
6 | Assign Project Group |
% Difference: Comparison between, regional head vs senior principle and regional head vs consultant.
Most Common Feedback:
- Inverted Burn-down Chart (S-Curve)
- Pop up window when deleting and when functionality is done successfully
- Difference between “Risk” and “Issues” & Risk function to be more user-friendly
Feedback | Before | After |
Inverted Burn-down Chart (S-Curve) | ||
Pop up window when deleting and when functionality is done successfully |
||
Difference between “Risk” and “Issues” |
User Testing 2
Testing Environment:
- Laboratory Studies, Controller Environment
- Test conducted at Infosys Lodestone office and is simulated during their office hours
Measurements:
- Time taken to do a particular task
Testers:
- Consultant x 5
Results:
Task No. | Function |
1 | Dashboard |
2 | User Profile |
3 | Upload Project Plan |
4 | Download Project Plan |
5 | CRUD Risks |
6 | Assign Project Group |
Most Common Feedback:
- Current password field when changing password
- Risk/Issue “R.A.G” algorithm & Filtering
- Burn down chart Color
- Edit task within web application
Feedback | Before | After |
Current password field when changing password | ||
Risk/Issue “R.A.G” algorithm & Filtering | ||
Burn down chart Color | ||
Edit task within web application | NIL |
User Acceptance Testing
UAT results (compared with UT1 and UT2)
Results:
Task No. | Function |
1 | Dashboard |
2 | User Profile |
3 | Upload Project Plan |
4 | Download Project Plan |
5 | CRUD Risks |
6 | Assign Project Group |