IS480 Team wiki: 2011T2 Eureka User Acceptance Test

From IS480
Jump to navigation Jump to search
Team Eureka logo.jpg







User Acceptance Test

Genius was 1 percent inspiration and 99 percent perspiration...


Home   Project Stakeholders   Project Overview   Usability & Storyboard   Project Management   Learning Outcomes   Sitemap
Game Description Storyboarding User Acceptance Test Heuristic Evaluation


UT No. Results Description Results Summary
User Test 1 (17 Jul '12)

Trading (Acer Tablet)
Trading (Motorola Tablet)
Trading (Emulator)

Simulation (Acer Tablet)
Simulation (Motorola Tablet)
Simulation (Emulator)

User Testing of Trading and Simulation Phases. The main points of testing:
  • Testing on 3 platforms: Acer Tablet, Motorola Tablet and Emulator
  • Consists of 3 groups of 3 testers and 1 administrator machine
  • Set up at Epiphany Education office at Tai Seng
  • Testers are made up of employees of the company
Summary of Results:
  • Graphics differ on different mediums of testing such as between Motorola Tablet and Acer Tablet despite screen sizes set at 10.1 inches display
  • Simulation Phase for Motorola Tablet extremely laggy
  • Saving and loading of built buildings does not work all the time and it may appear on a different patch in the map when reloaded
  • Trading phase table alignment in "View Offers" and "View Requests"
  • Alignment of bottom taskbar overlapped by tablet taskbar
User Test 2 (21 Aug '12)

Simulation
Trading
Web Admin Control

User Testing of Trading and Simulation Phases & Web Admin Control. The main points of testing:
  • Testing on 2 platforms: Acer Tablet and Emulator
  • Consists of 4 groups of 1 tester and 1 administrator machine
  • Set up at SMU SIS Meeting Room 4-7
  • Testers are made up of employees of the company
Summary of Results:
  • No functional problems – all test cases pass
  • Client was happy with the Trading phase user interface
  • Scrollable map does not work for the Motorola tablet
  • Confusion with regards to round control
  • UT2 has more feedback on usability

Back to Top

UAT No. Test Medium and Parameters Description Results Summary
User Acceptance Test 1
(19 Oct '12)
9 Students
  • 5 Teams
  • 1 Administrator
  • Students from Millennia Institute
  • UAT conducted on-site at Millenia Institute
  • 1530hrs - 1800hrs (2 hours 30 minutes)
  • Unguided - to see how students will react to the game for the first time
  • Trading Phase
  • Building Phase
  • Web Administrator Control
  • Essential to communicate (to the students) knowledge and instructions of the game prior to playing in order for the game to be run smoothly
    • Rules of the game
    • Goals and objectives
  • Usability Issues:
    • Recalling resource values:
      • When building
      • When producing
      • When buying items