SMT201 AY2019-20T1 EX2 Tay Jing Wen
Revision as of 14:18, 10 November 2019 by Jingwen.tay.2018 (talk | contribs) (→PART 4: Analytical Hierarchical Process Input Matrix)
Contents
PART 1: Gombak and the 4 Target Views
Description
Buildings:
Natural:
Roads:
Digital Elevation:
PART 2: Gombak and the 4 Proximity Views
Description
Buildings:
Natural:
Roads:
Slope:
PART 3: Criterion Score
Description
To apply Standardization with minmax, the minimum and maximum values are retrieve through Raster Layer Statistics. The following shows the formula and values to standardardize each layer.
Buildings: ("StandardProximity_Buildings@1" - 0) / (838.4658813476562 - 0)
Natural: ("StandardProximity_Natural@1" - 0) / (863.6694946289062 - 0)
Roads: ("StandardProximity_Roads@1" - 0) / (743.303466796875 - 0)
Slope: ("StandardProximity_Slope@1" - 0) / (36.41904830932617 - 0)
PART 4: Analytical Hierarchical Process Input Matrix
PART 5: Suitability Land Lot