SMT201 AY2019-20T1 EX2 Wang Youjin

From Geospatial Analytics for Urban Planning
Revision as of 15:46, 30 October 2019 by Youjin.wang.2016 (talk | contribs)
Jump to navigation Jump to search

Part 1: Base Map Views

4 basic map views showing: 1) Gombak Road 2) Gombak Building 3) Gombak Natural Features 4) Digital Elevation together with targeted study area - Bukit Gombak:

Map Type Map View Layout
1.Gombak Road - shows the study area and the target roads

Description


School types


Description


2.Gombak Building - the study area and buildings

Layer Imported:

Description

[[File:|600px|center]]

Road Network




3. Gombak Target Natural Feature- the study area and the target natural features Layer:

Categorization technique is used to indicate the land used for different purpose. <brt

Land Use


4.Digital Elevation - the study area and digital elevation

Layer Imported:

Description

[[File:|600px|center]]

Road Network



Part 2: Factor Layers:Proximity and Slope Map Views

Four views showing the proximity map to 1)target roads layer, 2) buildings layer,3) target natural features layer and 4) slope layer that are created in Part 1.

Map Type Map View Layout
1. Proximity to target roads layer

Layer:

description

[[File:|center|600px]]

2010 65+ Map


2.Proximity to target building layer

Layer Imported:

Description


[[File:|center|500px]]

2018 65+ Map



3.Proximity to target natural features layer

Layer Imported:


Description

[[File:|center|400px]]

Proportion of Aged population of 2018




4.Slope Layer


Description

[[File:|center|400px]]

Proportion of Aged population of 2018



Part 3: Factor Layers with Criterion Scores

A map layout with four views showing the criterion scores of each factor layers including 1)Economic factor 2) Accessibility Factor 3) Health Risk Factor 4) Natural Conservation Factor

Factor Layer Criterion Scores
1. Economic Factor

he selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost.




School types


Description


2. Accessibility Factor

The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage

[[File:|600px|center]]

Road Network




3. Health Risk Factor

The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population

Land Use


4.Natural Conservation Factor

The selected site should be away from forested land, park and water

[[File:|600px|center]]

Road Network



Part 4: Analytical Hierarchical Process (AHP) input matrix

An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.

Factor Layer Criterion Scores
input matric

Description


School types


Description

Part 5: Suitability land lot

A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.


Conclusion Map Layout
Land Lot

Description


School types


Description