SMT201 AY2019-20G2 Ex2 Lu Zhimao
Revision as of 23:28, 10 November 2019 by Zhimao.lu.2018 (talk | contribs) (→Part One: Gombak in 4 Views)
Contents
Part One: Gombak in 4 Views
- The study area and the target roads
- The study area and buildings
- The Study area and the target natural features
- The study area and digital elevation
Part Two: Gombak in 4 Views (Proximity)
- Gombak & Proxmity to Target Roads
- Gombak & Proximity to Buildings
- Gombak & Proximity to Target Natural Features
- Gombak & Slope
Part Three: A map layout with four view showing the criterion scores of each factor layer
- Accessibility Factor
- Health risk Factor
- Natrual Conversation Factor
- Economic Factor
Part Four: An Analytical Hierachical input matrix and result report
Part Five: A map layout with the suitability land lot(s)
- Step 1
- Step 2
- Step 3
- Step 4