Difference between revisions of "SMT201 AY2019-20G1 Ex2 Luo Junru"

From Geospatial Analytics for Urban Planning
Jump to navigation Jump to search
Line 3: Line 3:
 
Steep slope should be avoided because it is rather expensive to build a site there as compared to a flat ground.<br />
 
Steep slope should be avoided because it is rather expensive to build a site there as compared to a flat ground.<br />
 
2. Accessibility: <br />
 
2. Accessibility: <br />
The site should be close to road to facilitate the construction process.<br />
+
The site should be closer to roads to facilitate the construction process.<br />
 
3. Health risk factor:<br />
 
3. Health risk factor:<br />
 
The site should be away from buildings to prevent the disease from spreading to the population.<br />
 
The site should be away from buildings to prevent the disease from spreading to the population.<br />
 
4. Natural conservation factor:<br />
 
4. Natural conservation factor:<br />
The site should be away from natural areas because natural sites are usually far away from roads, thus if the site is near natural areas, it may be inaccessible also.  <br /><br /><br />
+
The site should be away from natural areas because natural sites are usually far away from roads, thus if the site is near natural areas, it may be inaccessible also.  <br /><br />
  
 
The data used for this assignment are retrieved from the following websites: <br />
 
The data used for this assignment are retrieved from the following websites: <br />
Line 19: Line 19:
 
===Target roads, buildings, target natural features and digital elevation===
 
===Target roads, buildings, target natural features and digital elevation===
 
[[File:Part1-ljr-final.png|600px|center]]
 
[[File:Part1-ljr-final.png|600px|center]]
 
+
The above picture includes 4 maps showing the distribution of roads, buildings, natural areas and slope digital elevation. Generally, the eastern side of Gombak have denser road networks. Hence, the site could possibly be built at the eastern side. The buildings are concentrated mainly at the north of Gombak, so the site could possibly be built at the Southern part of Gombak. Natural features are spread out across Gombak. There is no obvious specific part of Gombak to build the site from the 3rd map yet. The central south of Gombak has higher elevation, so we should avoid this area. Overall, the southern part of Gombak will be more suitable to build the site.<br />
  
 
== Part 2==
 
== Part 2==
 
=== Proximity analysis===
 
=== Proximity analysis===
 
[[File:Part_2-ljr.jpg|600px|center]]
 
[[File:Part_2-ljr.jpg|600px|center]]
 
+
The above picture shows 4 maps analysing the proximity from various features. From the first map, most of the Gombak area are near road networks, especially the Central South and the Eastern part. From the second map, buildings in Gombak are mostly concentrated at the northern part of Gombak and the Eastern part are far from buildings. From the third map, mainly the Southern part of Gombak is far from the natural features. From the last map, the slope steepness is generally well spread out. Since the analysis in front support the site to be built at the Southern part of Gombak, we can study specific areas there where the slope is less steep.<br />
  
 
== Part 3==
 
== Part 3==
 
===Criterion scores===
 
===Criterion scores===
 +
I standardized the scores for each of the proximity layers based on the 4 criteria. This is because the 4 layers have different ranges of proximity distances. By standardizing them, it will ensure a fairer comparison. This is done by performing min-max calculation with the raster calculator. The formula for min-max standardization is as follows:<br />
 
[[File:Part_3.0-ljr.png|300px|center]]
 
[[File:Part_3.0-ljr.png|300px|center]]
Reference: Prof Kam’s Lesson 9: GIS Modelling for Urban Planning Support ppt notes
+
(Reference: Prof Kam’s Lesson 9: GIS Modelling for Urban Planning Support ppt notes)<br />
 +
An example is shown below to produce the standardized proximity layer for buildings. Since the minimum distance is 0, it is omitted in my calculation below.
 
[[File:Part_3.1-ljr.png|600px|center]]
 
[[File:Part_3.1-ljr.png|600px|center]]
 
[[File:Part_3.2-ljr.png|600px|center]]
 
[[File:Part_3.2-ljr.png|600px|center]]
 +
The above picture shows 4 maps of the standardized proximity from various features and the steepness of the slope. After standardizing, the scores will range from 0 to 1. However, for presentation I adjusted them to blocks of 10 of equal interval classification. Therefore, for values <=0.1, I will label them as 1, for 0.1-0.2 it will be 2, for 0.2-0.3 will be 3 and so on until it hits 10.<br />
 +
 +
From the first map on roads we can see that generally most parts of Gombak are near roads so there is no specific area that we need to avoid to build the site. For the map on buildings, the Southern part of Gombak is the far away from buildings so it supports our findings in front on the Southern part possibly being a suitable place to build the site. Moreover, the third map on natural features also support this with the Southern part of Gombak having the highest scores, meaning it is the furthest from natural features. Looking at the last map for slope, the areas closer to the borders of the Gombak area seems to be less steep so overall, a possible area to build the site could be at the Southern part of Gombak and near the borders.<br />
 +
  
 
== Part 4==
 
== Part 4==
 
===Analytical Hierarchical Process input matrix===
 
===Analytical Hierarchical Process input matrix===
 
[[File:Part_4.1-ljr.png|600px|center]]
 
[[File:Part_4.1-ljr.png|600px|center]]
 +
The above screenshot shows the analytic hierarchy process. In this case, the accessibility is more important than economic but their difference in terms of importance is also not that big so I put 1/3. Health risk is a lot more important than all the other factors as it is the main concern of the centre since it is related to health of the people. This explains the fraction of 1/8 and 1/6. Natural features is not much of a concern as compared to other factors because it does not affect the daily process of the centre and the population as much as the other factors. This explains why under natural all the numbers are whole numbers instead of fractions.
 
[[File:Part_4.2-ljr.png|600px|center]]
 
[[File:Part_4.2-ljr.png|600px|center]]
 +
After finishing the matrix, the consistency is less than 10%, which means the matrix is good to continue. Overall, the most important factor is health risk (0.684) , followed by accessibility (0.172), then economic (0.086) and natural (0.057).<br />
 +
 +
  
 
==Part 5==
 
==Part 5==
 
=== Suitability land lot for building a national Communicable Disease Quarantine Centre===
 
=== Suitability land lot for building a national Communicable Disease Quarantine Centre===
 
[[File:Part_5.1-ljr.png|600px|center]]
 
[[File:Part_5.1-ljr.png|600px|center]]
 +
From the values shown at the columns total from the above screenshot from the Analytical Hierarchy Process, we can use the raster calculator to produce the overall model for the land suitability as shown from the screenshot below.
 
[[File:Part_5.2-ljr.png|600px|center]]
 
[[File:Part_5.2-ljr.png|600px|center]]
 +
The output will be the overall-score layer as shown below.
 
[[File:Part_5.3-ljr.png|600px|center]]
 
[[File:Part_5.3-ljr.png|600px|center]]
 +
After this, I created a new layer and I drew out a polygon at the Southern part of Gombak based on the overall highest score area.
 
[[File:Part_5.4-ljr.png|600px|center]]
 
[[File:Part_5.4-ljr.png|600px|center]]
 +
Therefore, this new layer will contain 2 columns of id and area, of which I specified id to be a whole number but area to have decimal places.
 
[[File:Part_5.5-ljr.png|600px|center]]
 
[[File:Part_5.5-ljr.png|600px|center]]
 +
I converted the scores to be out of 100 for better visualisation. This is done by taking the “overall-score@1” minus the minimum score for the overall-score layer then divide by the maximum and minimum score from the overall-score layer.
 
[[File:Part_5.6-ljr.png|600px|center]]
 
[[File:Part_5.6-ljr.png|600px|center]]
 +
I went on to check if that area fits the criteria of more than 10,000m^3, which it did in this case as shown on the screenshot above. Hence the site area proposed can be the actual area to build the site as it has the highest score overall from the overall-score layer and also fits the criteria of the area size. Moreover, the shape is not odd, making it wide and long enough to build a building there.

Revision as of 15:07, 10 November 2019

The objective is to identify a location suitable for building a national Communicable Disease Quarantine Centre at the Gombak planning subzone. In order to examine potential site suitability, 4 factors are taken into consideration:
1. Economic:
Steep slope should be avoided because it is rather expensive to build a site there as compared to a flat ground.
2. Accessibility:
The site should be closer to roads to facilitate the construction process.
3. Health risk factor:
The site should be away from buildings to prevent the disease from spreading to the population.
4. Natural conservation factor:
The site should be away from natural areas because natural sites are usually far away from roads, thus if the site is near natural areas, it may be inaccessible also.

The data used for this assignment are retrieved from the following websites:
• Master Plan 2014 Subzone Boundary from data.gov.sg.
• Roads, buildings and natural features data from OpenStreetMap (OSM) via BBBike@Singapore.
• ASTER Global Digital Elevation Model (GDEM) dataset jointly prepared by NASA and METI, Japan from NASA’s EarthData Search site.


Part 1

Target roads, buildings, target natural features and digital elevation

Part1-ljr-final.png

The above picture includes 4 maps showing the distribution of roads, buildings, natural areas and slope digital elevation. Generally, the eastern side of Gombak have denser road networks. Hence, the site could possibly be built at the eastern side. The buildings are concentrated mainly at the north of Gombak, so the site could possibly be built at the Southern part of Gombak. Natural features are spread out across Gombak. There is no obvious specific part of Gombak to build the site from the 3rd map yet. The central south of Gombak has higher elevation, so we should avoid this area. Overall, the southern part of Gombak will be more suitable to build the site.

Part 2

Proximity analysis

Part 2-ljr.jpg

The above picture shows 4 maps analysing the proximity from various features. From the first map, most of the Gombak area are near road networks, especially the Central South and the Eastern part. From the second map, buildings in Gombak are mostly concentrated at the northern part of Gombak and the Eastern part are far from buildings. From the third map, mainly the Southern part of Gombak is far from the natural features. From the last map, the slope steepness is generally well spread out. Since the analysis in front support the site to be built at the Southern part of Gombak, we can study specific areas there where the slope is less steep.

Part 3

Criterion scores

I standardized the scores for each of the proximity layers based on the 4 criteria. This is because the 4 layers have different ranges of proximity distances. By standardizing them, it will ensure a fairer comparison. This is done by performing min-max calculation with the raster calculator. The formula for min-max standardization is as follows:

Part 3.0-ljr.png

(Reference: Prof Kam’s Lesson 9: GIS Modelling for Urban Planning Support ppt notes)
An example is shown below to produce the standardized proximity layer for buildings. Since the minimum distance is 0, it is omitted in my calculation below.

Part 3.1-ljr.png
Part 3.2-ljr.png

The above picture shows 4 maps of the standardized proximity from various features and the steepness of the slope. After standardizing, the scores will range from 0 to 1. However, for presentation I adjusted them to blocks of 10 of equal interval classification. Therefore, for values <=0.1, I will label them as 1, for 0.1-0.2 it will be 2, for 0.2-0.3 will be 3 and so on until it hits 10.

From the first map on roads we can see that generally most parts of Gombak are near roads so there is no specific area that we need to avoid to build the site. For the map on buildings, the Southern part of Gombak is the far away from buildings so it supports our findings in front on the Southern part possibly being a suitable place to build the site. Moreover, the third map on natural features also support this with the Southern part of Gombak having the highest scores, meaning it is the furthest from natural features. Looking at the last map for slope, the areas closer to the borders of the Gombak area seems to be less steep so overall, a possible area to build the site could be at the Southern part of Gombak and near the borders.


Part 4

Analytical Hierarchical Process input matrix

Part 4.1-ljr.png

The above screenshot shows the analytic hierarchy process. In this case, the accessibility is more important than economic but their difference in terms of importance is also not that big so I put 1/3. Health risk is a lot more important than all the other factors as it is the main concern of the centre since it is related to health of the people. This explains the fraction of 1/8 and 1/6. Natural features is not much of a concern as compared to other factors because it does not affect the daily process of the centre and the population as much as the other factors. This explains why under natural all the numbers are whole numbers instead of fractions.

Part 4.2-ljr.png

After finishing the matrix, the consistency is less than 10%, which means the matrix is good to continue. Overall, the most important factor is health risk (0.684) , followed by accessibility (0.172), then economic (0.086) and natural (0.057).


Part 5

Suitability land lot for building a national Communicable Disease Quarantine Centre

Part 5.1-ljr.png

From the values shown at the columns total from the above screenshot from the Analytical Hierarchy Process, we can use the raster calculator to produce the overall model for the land suitability as shown from the screenshot below.

Part 5.2-ljr.png

The output will be the overall-score layer as shown below.

Part 5.3-ljr.png

After this, I created a new layer and I drew out a polygon at the Southern part of Gombak based on the overall highest score area.

Part 5.4-ljr.png

Therefore, this new layer will contain 2 columns of id and area, of which I specified id to be a whole number but area to have decimal places.

Part 5.5-ljr.png

I converted the scores to be out of 100 for better visualisation. This is done by taking the “overall-score@1” minus the minimum score for the overall-score layer then divide by the maximum and minimum score from the overall-score layer.

Part 5.6-ljr.png

I went on to check if that area fits the criteria of more than 10,000m^3, which it did in this case as shown on the screenshot above. Hence the site area proposed can be the actual area to build the site as it has the highest score overall from the overall-score layer and also fits the criteria of the area size. Moreover, the shape is not odd, making it wide and long enough to build a building there.