Difference between revisions of "SMT201 AY2019-20G1 Ex2 Kning Kit Siang"

From Geospatial Analytics for Urban Planning
Jump to navigation Jump to search
Line 22: Line 22:
  
  
== Analytical Hierarchical Process input matrix and result report ==
+
== Analytical Hierarchical Process Input Matrix and Result Report ==
  
 
[[File:Analytical Hierarchical Process (Input matrix).png|center|880px]]
 
[[File:Analytical Hierarchical Process (Input matrix).png|center|880px]]
Line 28: Line 28:
  
 
[[File:Analytical Hierarchical Process (Scores).png|center|380px]]
 
[[File:Analytical Hierarchical Process (Scores).png|center|380px]]
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
== Suitability Land Lot(s) ==
 
== Suitability Land Lot(s) ==

Revision as of 21:05, 8 November 2019

GIS Modelling for Urban Land Suitability Study

Target Roads, Buildings, Target Natural Features and Digital Elevation of Study Area (Gombak)

Gombak Views.jpg




Proximity to Target Roads, Buildings and Natural Features with Slope Layer of Study Area (Gombak)

Gombak Proximity Views.jpg



Criterion Scores of each factor layers

Gombak Standardised Proximity.jpg


Analytical Hierarchical Process Input Matrix and Result Report

Analytical Hierarchical Process (Input matrix).png


Analytical Hierarchical Process (Scores).png

Suitability Land Lot(s)