Difference between revisions of "SMT201 AY2019-20G1 Ex2 Kning Kit Siang"
Jump to navigation
Jump to search
Kskning.2018 (talk | contribs) |
Kskning.2018 (talk | contribs) |
||
Line 24: | Line 24: | ||
== Analytical Hierarchical Process input matrix and result report == | == Analytical Hierarchical Process input matrix and result report == | ||
− | [[File:Analytical Hierarchical Process (Input matrix).png| | + | [[File:Analytical Hierarchical Process (Input matrix).png|center|880px]] |
+ | |||
+ | |||
+ | [[File:Analytical Hierarchical Process (Scores).png|center|380px]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
== Suitability Land Lot(s) == | == Suitability Land Lot(s) == |
Revision as of 21:05, 8 November 2019
GIS Modelling for Urban Land Suitability Study
Contents
- 1 Target Roads, Buildings, Target Natural Features and Digital Elevation of Study Area (Gombak)
- 2 Proximity to Target Roads, Buildings and Natural Features with Slope Layer of Study Area (Gombak)
- 3 Criterion Scores of each factor layers
- 4 Analytical Hierarchical Process input matrix and result report
- 5 Suitability Land Lot(s)
Target Roads, Buildings, Target Natural Features and Digital Elevation of Study Area (Gombak)
Proximity to Target Roads, Buildings and Natural Features with Slope Layer of Study Area (Gombak)
Criterion Scores of each factor layers
Analytical Hierarchical Process input matrix and result report