Difference between revisions of "SMT201 AY2019-20G2 EX2 Lek Jan Yee Lois"
Line 1: | Line 1: | ||
===GIS Modelling for Urban Land Suitability Study=== | ===GIS Modelling for Urban Land Suitability Study=== | ||
− | + | <div style="background: #f48478; padding: 20px; line-height: 0em; text-indent: 0px;letter-spacing:0.0em;font-size:18px; text-align: left"><font color=#ffffff face="Roboto">Problem Statement</font></div> | |
We are conducting a study to identify a suitable location for building a National Communicable Disease Quarrantine Centre located at Gombak planning subzone. The site would need to have a contiguous area of at least 10,000m2 and meet the following criteria:<br> | We are conducting a study to identify a suitable location for building a National Communicable Disease Quarrantine Centre located at Gombak planning subzone. The site would need to have a contiguous area of at least 10,000m2 and meet the following criteria:<br> | ||
Line 10: | Line 10: | ||
− | + | <div style="background: #f48478; padding: 20px; line-height: 0em; text-indent: 0px;letter-spacing:0.0em;font-size:18px; text-align: left"><font color=#ffffff face="Roboto">Data Preparation</font></div> | |
The data for this analysis was obtained from the Master Plan 2014 Subzone Boundary, BBBike Singapore (buildings, roads, nature) and ASTER Global Digital Elevation Model (Elevation raster layer). | The data for this analysis was obtained from the Master Plan 2014 Subzone Boundary, BBBike Singapore (buildings, roads, nature) and ASTER Global Digital Elevation Model (Elevation raster layer). | ||
− | ===References | + | |
+ | |||
+ | <div style="background: #f48478; padding: 20px; line-height: 0em; text-indent: 0px;letter-spacing:0.0em;font-size:18px; text-align: left"><font color=#ffffff face="Roboto">References</font></div> | ||
#Master Plan 2014 Subzone Boundary [[https://data.gov.sg/dataset/master-plan-2014-subzone-boundary-no-sea]] | #Master Plan 2014 Subzone Boundary [[https://data.gov.sg/dataset/master-plan-2014-subzone-boundary-no-sea]] | ||
#BBBike Singapore [[https://www.bbbike.org/Singapore/]] | #BBBike Singapore [[https://www.bbbike.org/Singapore/]] |
Revision as of 19:43, 7 November 2019
GIS Modelling for Urban Land Suitability Study
We are conducting a study to identify a suitable location for building a National Communicable Disease Quarrantine Centre located at Gombak planning subzone. The site would need to have a contiguous area of at least 10,000m2 and meet the following criteria:
1) Economic factor: The site should avoid having steep slopes as that would require cutting and filling which would amount to a relatively higher development cost.
2) Accessibility factor: The site should be close to existing roads (service roads and tracks) for easy transportation of building materials
3) Health risk factor: The site should be away from the population as we would want to prevent the disease from spreading.
4) Natural conservation factor: The site should be away from forested land, water and parks.
The data for this analysis was obtained from the Master Plan 2014 Subzone Boundary, BBBike Singapore (buildings, roads, nature) and ASTER Global Digital Elevation Model (Elevation raster layer).