Difference between revisions of "SMT201 AY2019-20G1 EX2 Kok Jim Meng"
Jump to navigation
Jump to search
Line 60: | Line 60: | ||
==Part 4: Analytical Hierarchical Process (AHP)== | ==Part 4: Analytical Hierarchical Process (AHP)== | ||
==Part 5: Suitability Analysis== | ==Part 5: Suitability Analysis== | ||
+ | Based on the weights computed in AHP (which are equal to 1), we use Raster Calculator to calculate the suitability by applying the following formulas: |
Revision as of 15:10, 5 November 2019
Contents
Part 1: Map Layouts of Extractions
Target Roads
1
Buildings
2
Target Natural Features
3
Digital Elevation
4
Part 2: Map Layouts of Proximity
Proximity to Target Roads
1
Proximity to Buildings
2
Proximity to Target Natural Features
3
Slope
4
Part 3: Map Layouts of Criterion Scores
Maps |
Description |
1 |
1 |
2 |
2 |
3 |
3 |
4 |
4 |
Part 4: Analytical Hierarchical Process (AHP)
Part 5: Suitability Analysis
Based on the weights computed in AHP (which are equal to 1), we use Raster Calculator to calculate the suitability by applying the following formulas: