Difference between revisions of "SMT201 AY2018-19T1 EX2 Tan Jie Ting Christine"
Jump to navigation
Jump to search
Jttan.2018 (talk | contribs) (Replaced content with "== Part 1: == == Part 2: ==") Tag: Replaced |
Jttan.2018 (talk | contribs) |
||
Line 1: | Line 1: | ||
− | == Part 1: == | + | == Part 1: Decision Factors == |
+ | |||
+ | === Economic Factor === | ||
+ | |||
+ | === Accessibility Factor === | ||
+ | The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage. | ||
+ | I assume that for the site to be accessible, the site must be at least 200m away from local roads. | ||
== Part 2: == | == Part 2: == |
Revision as of 17:54, 29 October 2019
Part 1: Decision Factors
Economic Factor
Accessibility Factor
The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage. I assume that for the site to be accessible, the site must be at least 200m away from local roads.