Difference between revisions of "Group1 Introduction"
Jump to navigation
Jump to search
(intro edit1) |
|||
Line 35: | Line 35: | ||
== Welcome to Group 1 project page == | == Welcome to Group 1 project page == | ||
− | The wiki contains a guide on the project carried out by Group 1, which pertains to the | + | The wiki contains a guide on the project carried out by Group 1, which pertains to the investigation of corridors of vehicle traffic. It will cover the following. |
− | *What | + | *What was the motivation behind the project? |
*What data sets were used? How was project planning carried out? | *What data sets were used? How was project planning carried out? | ||
− | *Project | + | *Project deliverables timeline |
*Application of the analysis carried out here | *Application of the analysis carried out here | ||
*Poster | *Poster | ||
*Related links and references | *Related links and references |
Revision as of 08:38, 24 July 2017
Unlocking insights from the VAST Challenge 2017
|
|
|
|
|
|
Welcome to Group 1 project page
The wiki contains a guide on the project carried out by Group 1, which pertains to the investigation of corridors of vehicle traffic. It will cover the following.
- What was the motivation behind the project?
- What data sets were used? How was project planning carried out?
- Project deliverables timeline
- Application of the analysis carried out here
- Poster
- Related links and references